 |
| In principle, the institution / private universities (PTS) that belongs to the people who always put the quality of higher education. However, the Leading Private Universities and Accredited still has SOCIAL COMMITMENT. Among others, to assist students in paying the cost of education by providing tuition credit facilities without interest, so the tuition fee can be paid in installments according to the ability of prospective students. In addition, some private universities provide scholarships directly to truly less well off financially.
The Universities (PTS) agreed to make the cost of education is only comprised of two components only, namely :
1. Development Contributions (SPb) or Admission Fee |
| Development Contributions can be repaid according to the study period, which can be repaid up to: » 46 times or 36 times for graduate SMA, SMK, D1, equivalent proceed to S1 Programs » 30 times for graduate SMA, SMK, D1, equivalent proceed to D-III Programs » 18 times for graduate D3/equivalent proceed to S1 Programs » 24 times for graduate S1/equivalent proceed to S2 Programs. Table installments can be seen below.
| 2. Contribution of Education each Semester (SPP) |
| The SPP has included BPP Basic, cash credits, examination fees, registration, and money practicum each semester. Any number of credits taken in a semester, tuition did not change. This tuition each semester can be repaid monthly. Table installments can be seen below.
| Total First Payment |
| Total First Payment = Installment 1 for the SPb + Installment 1 for the SPP + Jackets Civitas| Colleges | first SPb + first SPP + Jackets Civitas | | Universitas Buddhi Dharma | » Rp 1,200,000 To proceed to S1 - Department Of Accounting, Business Administration, Informatics Engineering, Information Systems, Communication Studies, & English Literature. » Rp 1,300,000 To proceed to S1 - Department of Management » Rp 850.000 To continue to S1 - Department of Software Engineering & Industrial Engineering » Rp 800.000 To proceed to S1 - Department of Electrical Engineering » Rp 500.000 To proceed to D3 » Rp 1.500.000 To proceed to S2
| | FKM UMJ | » IDR. (400.000 + 990.000+ 500.000) = IDR. 1.900.000 to proceed to S1 » IDR. (400.000 + 990.000+ 500.000) = IDR. 1.900.000 to proceed to S2 Public Health » IDR. (350.000 + 990.000+ 500.000) = IDR. 1.900.000 to proceed to S2 Hospital Administration
| | Fakultas Teknik UMJ | » IDR. 990,000 To continue to S1 » IDR. 990,000 To continue to S1 RPL Programs » IDR. 1,460,000 To continue to S2 » IDR. 1,460,000 To continue to S2 RPL Programs
| | STIE Hidayatullah Depok | » IDR. (0 + 400.000 + 150.000) = IDR. 550.000 to proceed to S1.
| | UIN Al-Azhaar Lubuklinggau | » IDR 500.000 For SMU graduates proceed to S1. » IDR 600.000 For D3 graduates proceed to S1. »IDR 925.000 For S1 Graduates proceed to S2.
| | IMA | » IDR (0 + 300.000 + 150.000) = IDR 450.000 to proceed to S1. | | STIE Indocakti Malang | » IDR. (450.000) = IDR. 450.000 High School, Vocational School, D1 to S1 Accounting, Management.
| | ISTA Jakarta | » Rp (600.000 = Rp 600.000 to continue to Bachelor’s Degree. » Rp (750.000) = Rp 750.000 to continue to Bachelor’s Degree in Chemical Engineering. » Rp (1.200.000) = Rp 1.200.000 to continue to Bachelor’s Degree in Pharmacy.
| | Universitas IVET Semarang | » Rp (100,000 + 500,000) = Rp 600,000 to continue to S1 - PPKN, History, Science, Economics, Geography, Mathematics. » IDR (100,000 + 600,000) = IDR 700,000 to continue to S1 - Environmental Science, Guidance Counselling. » Rp (100,000 + 400,000) = Rp 500,000 to continue to S1 - PAI, PGMI. » Rp (100,000 + 900,000) = Rp 1,000,000 to continue to S1 - Pend. Informatics, Health Administration, Syst. Information Technology, Nutrition, Tech. Safety, PVP. Automotive. » IDR (100,000 + 900,000) = IDR 1,000,000 to continue to S1 - Digital Business. » IDR (100,000 + 700,000) = IDR 800,000 to continue to D3
| | Universitas Kahuripan Kediri | » IDR (200.000 + 750.000 ) = IDR 950.000 to continue to S1 majoring in Accounting P2k » IDR (150.000 + 550.000 ) = IDR 700.000 to continue to S1 Department of Agrotechnology, PJKR, PPKN, Animal Husbandry, Electrical Engineering, Informatics Engineering, Civil Engineering, P2k .
| | MH UNKRIS Jakarta | » IDR (1.500.000) = IDR 1.500.000 to proceed to S2
| | MIA UNKRIS Jakarta | » IDR (1.500.000 = IDR 1.500.000 to proceed to S2
| | MM Patria Artha Makassar | First Payment S2 = 1st SPP : ( Free Cost SPb ) » IDR. 800.000 to proceed to S2 Program | | MM STIE ABI Surabaya | » IDR (1.000.000 + 2000.000) = IDR 1.200.000 to proceed to S2. | | MM STIE GICI Business School J | » IDR. (100.000 + 400.000 + 2.500.000) = IDR. 3.000.000 to proceed to S2 Program
| | MM UMIBA Jakarta | » IDR (1.100.000 + 150.000) = IDR 1.250.000 to proceed to S2. »IDR 1.950.000 to proceed S2 RPL Programs
| | MM UNKRIS Jakarta | » IDR (1.500.000 = IDR 1.500.000 to proceed to S2
| | S2 UIN Al-Azhaar Lubuklinggau | » IDR 925.000 For S1 Graduates proceed to S2.
| | MPD UM SURABAYA | » IDR (1.026.000+ 150.000) = IDR 1.176.000 continue to Masters. Online Class. slamic education » IDR (1.074.000+ 150.000) = IDR 1.224.000 proceed to Masters. Online Class. Indonesian Language and Literature Education
| | Universitas Mpu Tantular Jakar | » Rp 485.000 to proceed to S1 Reguler Programs. » IDR (820,000 + 150,000) = IDR 970,000 to proceed to S1. » IDR (1,000,000 + 250,000) = IDR 1,250,000 to proceed to S2. » IDR (960,000 + 150,000 + 100,000 ) = IDR 1,210,000 to proceed to S1 RPL Programs
| | Mpu Tantular Kedoya Jakarta | » Rp 485.000 to proceed to S1 Reguler Programs. » IDR (820,000 + 150,000) = IDR 970,000 to proceed to S1. » IDR (1,000,000 + 250,000) = IDR 1,250,000 to proceed to S2. » IDR (960,000 + 150,000 + 100,000 ) = IDR 1,210,000 to proceed to S1 RPL Programs
| | S2 FT UMJ | » IDR. 1,460,000 To continue to S2
| | MT UNKRIS Jakarta | » IDR (1.500.000 = IDR 1.500.000 to proceed to S2
| | UNAS PASIM | » IDR (555.000) = Rp 555.000 to proceed to S1. » IDR (555.000) = IDR 555.000 to proceed to D3
| | Universitas Patria Artha Makas | » IDR. (100.000 + 400.000) = IDR. 500.000 to proceed to D3 Program » IDR. (100.000 + 400.000) = IDR. 500.000 to proceed to S1 Program » IDR. 800.000 to proceed to S2 Program ( Free Cost SPb )
| | Polnas Denpasar | » IDR. (200.000 + 750.000) = IDR 950.000 to proceed to D3 P2K Programs.
| | Magister Universitas Buddhi Dh | » Rp 1.500.000 To proceed to Masters Program (S-2)
| | Magister Universitas Satyagama | » IDR. (1.000.000 + 350.000) = IDR. 850.000 to proceed to S2 Evening Class.
| | S2 UNKRIS Jakarta | » IDR (1.500.000 = IDR 1.500.000 to proceed to S2
| | S2 UNSURYA | » IDR. (250.000 + 825.000) = IDR. 1.075.000 to proceed to S2
| | Universitas Satyagama Jakarta | » IDR. (400.000 + 350.000) = IDR. 750.000 to proceed to D3. » IDR. (400.000 + 350.000) = IDR. 750.000 to proceed to S1. » IDR. (599.000 + 500.000) = IDR. 1.099.000 to proceed to S2
» IDR. (5.000.000 + 600.000) = IDR. 5.600.000 to proceed to S to proceed to S3 Semester 1. » IDR. 4.000.000 to proceed to S to proceed to S3 Semester 2 and 3. » IDR. 4.000.000 to proceed to S to proceed to S3 Semester 4.
| | STAN-IM | » Rp 500,000 to continue to the Bachelor’s Degree Program in Accounting and Program in Management.
| | STBA Lia Yogyakarta | » IDR (650.000) = IDR 650.000 to proceed to D3 & S1 .
| | STIE GICI Business School Dep | » IDR. (50.000 + 500.000) = IDR. 550.000 to proceed to S1 Program STIE Gici Jatiwaringin Jakarta » IDR. (30.000 + 550.000 + 250.000) = IDR. 830.000 to proceed to S1 Program Employee class STIE Gici Bekasi » IDR. (50.000 + 500.000) = IDR. 550.000 to proceed to S1 Program Online class STIE Gici Bekasi » IDR. (50.000 + 400.000 + 250.000) = IDR. 700.000 to proceed to S1 Program Employee class STIE Gici Depok » IDR. (400.000+ 250.000) = IDR. 650.000 to proceed to S1 Program Online Class STIE Gici Depok » IDR. (250.000 + 500.000) = IDR. 750.000 to proceed to S1 Program STIE Gici Bogor » IDR. (975.000 + 250.000) = IDR. 1.225.000 to proceed to S2 Program - STIE Gici Depok and Bogor » IDR. (975.000 + 200.000) = IDR. 1.175.000 to proceed to S2 Program - STIE Gici Jatiwaringin and Bekasi
| | STIE ABI Surabaya | » IDR (400.000 + 150.000) = IDR 550.000 to proceed to S1, Morning Class . » IDR (450.000 + 150.000) = IDR 600.000 to proceed to S1, Afternoon Class. » IDR (550.000 + 150.000) = IDR 700.000 to proceed to S1, Online Class. » IDR (1.000.000 + 200.000) = IDR 1.200.000 to proceed to S2.
| | STIE PASIM Sukabumi | » IDR 650.000 to proceed to S1.
| | STIESIA Surabaya | » IDR (3,500,000 + 1,200,000) = IDR 4,700,000 to continue to Bachelor Program (S1). » IDR (800,000) = IDR 800,000 to continue to Diploma Program (D3). » IDR (1,500,000) = IDR 1,500,000 to continue to Master Program (S2).
| | STIE Widya Darma Surabaya | » IDR (100.000 + 200.000 + 150.000) = Rp 450.000 to proceed to S1.
| | UBHINUS | » IDR. (500.000 + 500.000) = IDR. 1.000.000 to proceed to S1. » Rp (200,000 + 1,000,000) = Rp 1,000,000 to proceed to the Bachelor’s Degree in Digital Business and International Trade. » IDR. (300.000 + 500.000) = IDR. 800.000 to proceed to D3.
| | Universitas Mitra Bangsa | » IDR (375.000 + 150.000) = IDR 525.000 to proceed to D3. » IDR ( 450.000 + 150.000) = IDR 600.000 to proceed to S1. » IDR ( 525.000 + 150.000) = IDR 675.000 to proceed to S1 Management Programs. » IDR (1.100.000 + 150.000) = IDR 1.250.000 to proceed to S2. » IDR 710.000 to proceed S1 RPL Programs » IDR 1.950.000 to proceed S2 RPL Programs
| | STT Bina Tunggal Bekasi | » IDR 800,000 for high school graduates to continue to the S1 program. » IDR 875,000 for D3 graduates to continue to the S1 program. » IDR 750,000 for high school graduates to continue to the D3 program.
| | Universitas Tanri Abeng Jakart | » IDR (100.000+ 800.000 + 500.000) = IDR 1.400.000 to proceed to S1 Department Of Management & Communication Studies. » IDR (100.000+ 975.000 + 500.000) = IDR 1.575.000 to proceed to S1 Department of Accounting, Business Administration & Architecture. » IDR (100.000+ 800.000 + 500.000) = IDR 1.400.000 to proceed to S1 Department of Information Systems, Informatics Engineering & Civil Engineering.
| | UAI | » Rp (1,150,000) = Rp 1,150,000 for the S1 Electrical Engineering & International Relations Programs. » Rp (1,200,000) = Rp 1,200,000 for the S1 Industrial Engineering, Accounting & Arabic Language and Culture Programs. » Rp (1,250,000) = Rp 1,250,000 for the S1 Food Technology & Law Programs. » Rp (1,300,000) = Rp 1,300,000 for the S1 Management, Psychology & Informatics Programs.
| | Universitas Ubudiyah Indonesia | »IDR. (300,000 + 200,000) = IDR. 500,000 to proceed to S1 Psychology. »IDR. (300,000 + 300,000) = IDR. 600,000 to proceed to PGSD S1, P. Computer Science. »IDR. (400,000 + 300,000) = IDR. 700,000 to proceed to S1 Informatics, Information Systems, Nutrition Sciences, Community Health, Management, Accounting. »IDR. (400,000 + 300,000) = IDR. 700,000 to proceed to D3 Information Management, Computerized accounting. »IDR. (400,000 + 400,000) = IDR. 800,000 to proceed to S1 in Law, T. Sipil, Architecture. »IDR. (600,000 + 400,000) = IDR. 1,000,000 to proceed to D3, Midwifery D4. »IDR. (1,000,000 + 500,000) = IDR 1,500,000 to proceed to S1 Pharmacy.
| | UNHAMZAH Medan | » IDR. (50.000 + 300.000 + 150.000) = IDR. 500.000 to proceed to S1 Program
| | UICI | » Rp 400,000 to continue to the Bachelor’s Degree Program in Psychology. » Rp 500,000 to continue to the Bachelor’s Degree Program in Non-Psychology Majors.
| | UM Palangkaraya | » IDR. (150.000 + 750.000 + 150.000) = IDR. 1.050.000 to proceed to S1
| | Universitas Muhammadiyah Jakar | » IDR. (100.000 + 800.000 + 150.000) = IDR. 1.050.000 proceed to S1 Agricultural
» IDR (250,000 + 1,300,000 + 150,000) = IDR 1,700,000 to continue to S1 FISIP » IDR (250,000 + 1,750,000 + 150,000) = IDR 2,150,000 to continue to Bachelor of Communication Science FISIP » IDR (250,000 + 1,500,000 + 150,000) = IDR 1,900,000 to continue to Masters in Communication Science FISIP » IDR (250,000 + 1,350,000 + 150,000) = IDR 1,750,000 to continue to Masters in Administrative Sciences and Masters in Political Science FISIP
» Rp 990.000 Untuk melanjutkan ke S1 FT » Rp 1.460.000 Untuk melanjutkan ke S2 FT
| | Universitas Mochammad Sroedji | » IDR. (550.000 + 150.000) = IDR. 700.000 to proceed to S1. (Free SPb Fee)
| | UNAKI Semarang | » IDR. (550.000 + 50.000) = IDR. 600.000 to proceed to S1 Wave I. » IDR. (650.000 + 50.000) = IDR. 700.000 to proceed to S1 Wave II. » IDR. (750.000 + 50.000) = IDR. 800.000 to proceed to S1 Wave III. » IDR. (725.000 + 50.000) = IDR. 775.000 >For D3 graduates to proceed to S1
| | UNAS | » Rp (2,000,000) = Rp 2,000,000 for continuing to the Bachelor’s Program in Management. » Rp (1,900,000) = Rp 1,900,000 for continuing to the Bachelor’s Program in Accounting. » Rp (1,700,000) = Rp 1,700,000 for continuing to the Bachelor’s Program in Tourism. » Rp (1,600,000) = Rp 1,600,000 for continuing to the Bachelor’s Program in Digital Business. » Rp (1,500,000) = Rp 1,500,000 for continuing to the Master’s Program (S2). » Rp (3,000,000) = Rp 3,000,000 for continuing to the Doctoral Program (S3).
| | UNDARIS Ungaran Semarang | » IDR (375.000 + 650.000) = IDR 1.025.000 to proceed to S1 majoring in Law, Civil Engineering, Elementary School Teacher Education, Animal Husbandry, Management.» IDR (375,000 + 550,000) = IDR 925,000 to proceed to S1 for PPKN majors. » IDR (375,000 + 520,000) = IDR 895,000 to proceed to S1 majoring in Islamic Religious Education.
| | UNIBA Banyuwangi | » Rp (610.000 ) = IDR 610.000For SMU/SMK/MA graduates proceed to S1 » Rp (740.000) = IDR 740.000 For SMU/SMK/MA graduates proceed to S1 Department of Guidance Counseling, Pend. English, PJKR and Mechanical Engineering. » Rp (250.000 + 700.000) = IDR 950.000 For graduates of SMK/D3/equivalent proceed to S1 RPL. | | Universitas Gresik | » IDR 900,000 For high school/vocational high school graduates continuing to S1 » IDR 950,000 For D3 graduates continuing to S1 majoring in Computer Science » IDR 1,050,000 For D3 graduates continuing to S1 majoring in Management and Law » IDR 1,000,000 For D3 graduates continuing to S1 Civil Engineering, Mechanical Engineering, Accounting
» IDR 700,000 For D3 graduates continuing to S1 English Literature & Educational Administration » IDR 850,000 For D3 graduates continuing to S1 English Literature & Educational Administration
| | UNISA Kuningan Jawa Barat | » IDR (150.000 + 600.000) = IDR 750.000 to proceed to S1. » Rp (250,000 + 600,000) = Rp 850,000 to proceed to D3. » Rp (150,000 + 750,000) = Rp 900,000 to proceed to S2.
| | Universitas LIA | » IDR 750.000 to proceed to S1. » IDR 1.390.000 to proceed to S1 RPL Programs majoring in English & Japanese.
| | UNKRIS Jakarta | » IDR (1.100.000) = Rp 1.100.000 to proceed to S1. » IDR (1.500.000) = IDR 1.500.000 to proceed to S2
| | UNLIP | » Rp (500.000) = Rp 500.000 to continue to Bachelor’s Degree. » Rp (535.000) = Rp 535.000 to continue to Bachelor's Degrees in Informatics, Agroindustrial Engineering, and Civil Engineering.
| | UNSURYA Jakarta | » IDR. (100.000 + 600.000) = IDR. 700.000 to proceed to S1 - Information Systems » IDR. (150.000 + 600.000) = IDR. 750.000 to proceed to S1 - Management, Accounting, Law » IDR. (100.000 + 700.000) = IDR. 800.000 to proceed to S1 - Industrial Engineering » IDR. (150.000 + 700.000) = IDR. 850.000 to proceed to S1 - Electrical Engineering » IDR. (250.000 + 825.000) ) = IDR. 1.075.000 to proceed to S2 » IDR. (100.000 + 500.000) = IDR. 600.000 to proceed to D3 - Informatics Management » IDR. (200.000 + 750.000) = IDR. 950.000 to proceed to S1 RPL Programs » IDR. (600.000 + 1.200.000) ) = IDR. 1.800.000 to proceed to S2 RPL Programs » IDR. (150.000 + 600.000) = IDR. 750.000 to proceed to D3 - Informatics Management RPL Programs
| | Universitas Teknologi Nusantar | » IDR (0 + 400.000 + 350.000) = IDR 750.000 to proceed to S1 Reguler Program. » IDR (0 + 400.000 + 350.000) = IDR 750.000to proceed to S1 Evening, Weekend, and Blended Employee Class Programs (Free SPb Fee)
| | UWK Surabaya | » IDR (1.200.000 ) = Rp 1.200.000 to proceed to S1. » IDR (1.600.000 ) = Rp 1.600.000 to proceed to S2.
|
The remaining installments paid in installments as the table below.
Fast and direct way to the table corresponding PTS installments. Please click the word SPb or SPP underlined below.| 1. | SPb | SPP | Universitas Buddhi Dharma - Buddhi Dharma University | | 2. | SPb | SPP | FKM UMJ - Faculty of Public Health University of Muhammadiyah Jakarta | | 3. | SPb | SPP | Fakultas Teknik UMJ - Faculty of Engineering University of Muhammadiyah Jakarta | | 4. | SPb | SPP | STIE Hidayatullah Depok - Hidayatullah College of Economics Depok | | 5. | SPb | SPP | UIN Al-Azhaar Lubuklinggau - Al-Azhaar Nusantara Islamic University, Lubuklinggau | | 6. | SPb | SPP | IMA - Institut Miftahul Huda Al-Azhar | | 7. | SPb | SPP | STIE Indocakti Malang - Indocakti Malang College of Economics | | 8. | SPb | SPP | ISTA Jakarta - Institute of Science and Technology Al Kamal Jakarta | | 9. | SPb | SPP | Universitas IVET Semarang - Ivet University Semarang | | 10. | SPb | SPP | Universitas Kahuripan Kediri - University of Kahuripan Kediri | | 11. | SPb | SPP | MH UNKRIS Jakarta - Master of Law Krisnadwipayana University Jakarta | | 12. | SPb | SPP | MIA UNKRIS Jakarta - Master of Administrative Science Krisnadwipayana University Jakarta | | 13. | SPb | SPP | MM Patria Artha Makassar - Master of Management Patria Artha University Makassar | | 14. | SPb | SPP | MM STIE ABI Surabaya - Master of Manajemen STIE Artha Bodhi Surabaya | | 15. | SPb | SPP | MM STIE GICI Business School - Master of Management STIE GICI | | 16. | SPb | SPP | MM UMIBA Jakarta - Master of Management, Mitra Bangsa University, Jakarta | | 17. | SPb | SPP | MM UNKRIS Jakarta - Master of Management Krisnadwipayana University Jakarta | | 18. | SPb | SPP | S2 UIN Al-Azhaar Lubuklinggau - Master of Nusantara Islamic University Al-Azhaar Lubuklinggau | | 19. | SPb | SPP | MPD UM SURABAYA - Master of Education University of Muhammadiyah Surabaya | | 20. | SPb | SPP | Universitas Mpu Tantular Jakar - University of Mpu Tantular Jakarta | | 21. | SPb | SPP | Mpu Tantular Kedoya Jakarta - Mpu Tantular Jakarta Kedoya | | 22. | SPb | SPP | S2 FT UMJ - Magister Teknik Kimia Fakultas Teknik UMJ | | 23. | SPb | SPP | MT UNKRIS Jakarta - Master of Engineering Krisnadwipayana University Jakarta | | 24. | SPb | SPP | UNAS PASIM - Pasim National University Bandung | | 25. | SPb | SPP | Universitas Patria Artha Makas - Patria Artha University Makassar | | 26. | SPb | SPP | Polnas Denpasar - National Polytechnic Denpasar Bali | | 27. | SPb | SPP | Magister Universitas Buddhi Dh - Magister Universitas Buddhi Dharma | | 28. | SPb | SPP | Magister Universitas Satyagama - Magister Universitas Satyagama Jakarta | | 29. | SPb | SPP | S2 UNKRIS Jakarta - Krisnadwipayana Jakarta University Masters | | 30. | SPb | SPP | S2 UNSURYA - Master of Aerospace University Marshal Suryadarma | | 31. | SPb | SPP | Universitas Satyagama - Satyagama University | | 32. | SPb | SPP | STAN-IM - Sekolah Tinggi Ilmu Ekonomi STAN Indonesia Mandiri | | 33. | SPb | SPP | STBA Lia Yogyakarta - Lia Yogyakarta Foreign Language College | | 34. | SPb | SPP | STIE GICI Business School Dep - STIE GICI Business School | | 35. | SPb | SPP | STIE ABI Surabaya - Artha Bodhi Iswara College of Economic Surabaya | | 36. | SPb | SPP | STIE PASIM Sukabumi - Pasim College of Economics Sukabumi | | 37. | SPb | SPP | STIESIA Surabaya - Indonesian College of Economics Surabaya | | 38. | SPb | SPP | STIE Widya Darma Surabaya - College of Economic Widya Darma Surabaya | | 39. | SPb | SPP | UBHINUS - University Of Bhinneka Nusantara | | 40. | SPb | SPP | Universitas Mitra Bangsa - Mitra Bangsa University, Jakarta | | 41. | SPb | SPP | STT Bina Tunggal Bekasi - Bina Tunggal Bekasi College of Technology | | 42. | SPb | SPP | Universitas Tanri Abeng Jakart - TANRI ABENG UNIVERSITY Jakarta | | 43. | SPb | SPP | UAI - Universitas Al-Azhar Indonesia | | 44. | SPb | SPP | Universitas Ubudiyah Indonesia - University of Ubudiyah Indonesia Aceh | | 45. | SPb | SPP | UHAMZAH Medan - University of Amir Hamzah Medan | | 46. | SPb | SPP | UICI - Insan Cita Indonesia University | | 47. | SPb | SPP | UM Palangkaraya - Muhammadiyah University of Palangkaraya | | 48. | SPb | SPP | Universitas Muhammadiyah Jakar - University of Muhammadiyah Jakarta | | 49. | SPb | SPP | Universitas Mochammad Sroedji - Universitas Mochammad Sroedji Jember | | 50. | SPb | SPP | UNAKI Semarang - University of AKI Semarang | | 51. | SPb | SPP | UNAS - National Univeristy | | 52. | SPb | SPP | UNDARIS Ungaran Semarang - University of Islamic Centre Darul Ulum Sudirman GUPPI Ungaran Semaran | | 53. | SPb | SPP | UNIBA Banyuwangi - Universitas PGRI Banyuwangi | | 54. | SPb | SPP | Universitas Gresik - Gresik University | | 55. | SPb | SPP | UNISA Kuningan Jawa Barat - Islamic University of Al-Ihya Kuningan | | 56. | SPb | SPP | Universitas LIA - University of LIA | | 57. | SPb | SPP | UNKRIS Jakarta - University of Krisnadwipayana Jakarta | | 58. | SPb | SPP | UNLIP - Universitas Linggabuana PGRI Sukabumi | | 59. | SPb | SPP | UNSURYA Jakarta - University of Dirgantara Marsekal Suryadarma | | 60. | SPb | SPP | Universitas Teknologi Nusantar - Nusantara Technology University | | 61. | SPb | SPP | Universitas Wijaya Kusuma Sura - Wijaya Kusuma University Surabaya |
Table Installment Development Contributions (SPb) Shift Class (Blended) Program | 1. | Universitas Buddhi Dharma - Buddhi Dharma University | | 1.1. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of Accounting |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.295.000 1.295.000 1.295.000 1.295.000 1.295.000 | 1.535.000 1.535.000 1.535.000 1.535.000 1.535.000 -- | 1.920.000 1.920.000 1.920.000 1.915.000 -- -- | 2.560.000 2.560.000 2.555.000 -- -- -- | 7.675.000 -- -- -- -- -- |
| 1.2. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of Management |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.300.000 1.310.000 1.310.000 1.310.000 1.310.000 1.310.000 | 1.570.000 1.570.000 1.570.000 1.570.000 1.570.000 -- | 1.970.000 1.970.000 1.970.000 1.940.000 -- -- | 2.650.000 2.650.000 2.559.000 -- -- -- | 7.850.000 -- -- -- -- -- |
| 1.3. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of Business Administration |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.215.000 1.215.000 1.215.000 1.215.000 1.215.000 | 1.455.000 1.455.000 1.455.000 1.455.000 1.455.000 -- | 1.820.000 1.820.000 1.820.000 1.815.000 -- -- | 2.425.000 2.425.000 2.425.000 -- -- -- | 7.275.000 -- -- -- -- -- |
| 1.4. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of Informatics Engineering, Information Systems & Communication Science |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.240.000 1.240.000 1.240.000 1.240.000 1.240.000 | 1.480.000 1.480.000 1.480.000 1.480.000 1.480.000 -- | 1.850.000 1.850.000 1.850.000 1.850.000 -- -- | 2.470.000 2.470.000 2.460.000 -- -- -- | 7.400.000 -- -- -- -- -- |
| 1.5. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of Software Engineering |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 850.000 815.000 815.000 815.000 815.000 815.000 | 985.000 985.000 985.000 985.000 985.000 -- | 1.240.000 1.240.000 1.240.000 1.205.000 -- -- | 1.650.000 1.650.000 1.625.000 -- -- -- | 4.925.000 -- -- -- -- -- |
| 1.6. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of Electrical Engineering |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 800.000 790.000 790.000 790.000 790.000 790.000 | 950.000 950.000 950.000 950.000 950.000 -- | 1.190.000 1.190.000 1.190.000 1.180.000 -- -- | 1.590.000 1.590.000 1.570.000 -- -- -- | 4.750.000 -- -- -- -- -- |
| 1.7. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of Industrial Engineering |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 850.000 850.000 850.000 850.000 850.000 850.000 | 1.020.000 1.020.000 1.020.000 1.020.000 1.020.000 -- | 1.275.000 1.275.000 1.275.000 1.275.000 -- -- | 1.700.000 1.700.000 1.700.000 -- -- -- | 5.100.000 -- -- -- -- -- |
| 1.8. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program - Department of English literature |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.220.000 1.220.000 1.220.000 1.220.000 1.220.000 | 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 -- | 1.825.000 1.825.000 1.825.000 1.825.000 -- -- | 2.440.000 2.440.000 2.420.000 -- -- -- | 7.300.000 -- -- -- -- -- |
| 1.9. | Table Installment of UKT in Buddhi Dharma University | | For graduate SMA, SMK, equivalent proceed to D-3 Program - Department of Accounting & English |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 1.10. | UKT Table Installment at Buddhi Dharma University | | For Bachelor's Degree or equivalent graduates to continue to the Master's Program (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.530.000 1.530.000 1.530.000 1.530.000 1.530.000 | 1.830.000 1.830.000 1.830.000 1.830.000 1.830.000 -- | 2.300.000 2.300.000 2.300.000 2.250.000 -- -- | 3.050.000 3.050.000 3.050.000 -- -- -- | 9.150.000 -- -- -- -- -- |
| 2. | FKM UMJ - Faculty of Public Health University of Muhammadiyah Jakarta | | 2.1. | Table Installment of SPB at Faculty of Public Health University of Muhammadiyah Jakarta | | For graduate SMA/SMK, D3, Polytechnic, Academy proceed to S1 |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 500.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 225.000 100.000 | 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 450.000 150.000 -- -- | 875.000 -- 875.000 -- 875.000 875.000 875.000 -- 875.000 -- 875.000 875.000 875.000 -- 875.000 -- 875.000 -- -- 875.000 -- -- | 2.650.000 -- -- 2.650.000 -- -- 2.650.000 -- -- 2.650.000 -- -- -- -- -- -- -- -- -- -- -- -- | 10.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 2.2. | Table Installment of SPB at Faculty of Public Health University of Muhammadiyah Jakarta | | For S1 proceed ke Master of Public Health (S2) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 500.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 385.000 280.000 | 585.000 -- 585.000 585.000 585.000 -- 585.000 -- 585.000 -- 585.000 585.000 585.000 -- 585.000 -- 585.000 585.000 | 1.000.000 -- 1.000.000 -- 1.000.000 -- 1.000.000 -- 1.000.000 -- 1.000.000 -- 1.000.000 -- -- -- -- -- | 1.750.000 -- -- -- 1.750.000 -- 1.750.000 -- -- 1.750.000 -- -- -- -- -- -- -- -- | 7.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 2.3. | Table Installment of SPB at Faculty of Public Health University of Muhammadiyah Jakarta | | For S1 proceed ke Master of Administration of Hospital (S2) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 500.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 300.000 | 500.000 -- 500.000 500.000 500.000 -- 500.000 -- 500.000 -- 500.000 500.000 500.000 -- 500.000 -- 500.000 500.000 | 860.000 -- 860.000 -- 860.000 -- 860.000 -- 860.000 -- 860.000 -- 860.000 -- -- -- -- -- | 1.500.000 -- -- -- 1.500.000 -- 1.500.000 -- -- 1.500.000 -- -- -- -- -- -- -- -- | 6.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 3. | Fakultas Teknik UMJ - Faculty of Engineering University of Muhammadiyah Jakarta | | 3.1. | UKT Installment Table at the UMJ Faculty of Engineering | | For high school, vocational school, D3 or equivalent graduates, proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 990.000 990.000 990.000 990.000 990.000 990.000 | 1.188.000 1.188.000 1.188.000 1.188.000 1.188.000 -- | 1.485.000 1.485.000 1.485.000 1.485.000 -- -- | 1.980.000 1.860.000 1.860.000 -- -- -- | 5.940.000 -- -- -- -- -- |
| 3.2. | UKT Installment Table at the UMJ Faculty of Engineering | | For Bachelor's degree, proceed to Masters in Chemical Engineering (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 | 1.752.000 1.752.000 1.752.000 1.752.000 1.752.000 -- | 2.190.000 2.190.000 2.190.000 2.190.000 -- -- | 2.920.000 2.920.000 2.920.000 -- -- -- | 8.760.000 -- -- -- -- -- |
| 3.3. | UKT Installment Table at the UMJ Faculty of Engineering | | For high school, vocational school, D3 or equivalent graduates, proceed to Bachelor (S1) - RPL Programs |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 990.000 990.000 990.000 990.000 990.000 990.000 | 1.188.000 1.188.000 1.188.000 1.188.000 1.188.000 -- | 1.485.000 1.485.000 1.485.000 1.485.000 -- -- | 1.980.000 1.860.000 1.860.000 -- -- -- | 5.940.000 -- -- -- -- -- |
| 3.4. | UKT Installment Table at the UMJ Faculty of Engineering | | For Bachelor's degree, proceed to Masters in Chemical Engineering (S2) - RPL Programs |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 | 1.752.000 1.752.000 1.752.000 1.752.000 1.752.000 -- | 2.190.000 2.190.000 2.190.000 2.190.000 -- -- | 2.920.000 2.920.000 2.920.000 -- -- -- | 8.760.000 -- -- -- -- -- |
| 4. | STIE Hidayatullah Depok - Hidayatullah College of Economics Depok | | 4.1. | Free Table Installment of SPP in STIE Hidayatullah Employee Lecture and Online Program | | For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1 |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4 x | 1 x | | 0 | 0 | 0 | 0 | 0 |
| 5. | UIN Al-Azhaar Lubuklinggau - Al-Azhaar Nusantara Islamic University, Lubuklinggau | | 5.1. | Table Installment of UKT in Al-Azhaar Institute of Islamic Religion Lubuklinggau | | For graduate SMA/SMK etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 5.2. | Table Installment of UKT in Al-Azhaar Institute of Islamic Religion Lubuklinggau | | For graduate D3 etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 600.000 590.000 590.000 590.000 590.000 590.000 | 710.000 710.000 710.000 710.000 710.000 -- | 890.000 890.000 890.000 880.000 -- -- | 1.190.000 1.190.000 1.170.000 -- -- -- | 3.550.000 -- -- -- -- -- |
| 5.3. | Table Installment of UKT di Al-Azhaar Institute of Islamic Religion Lubuklinggau | | For S1 graduates, the equivalent continues to Postgraduate (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 925.000 915.000 915.000 915.000 915.000 915.000 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 -- | 1.375.000 1.375.000 1.375.000 1.375.000 -- -- | 1.834.000 1.833.000 1.833.000 -- -- -- | 5.500.000 -- -- -- -- -- |
| 6. | IMA - Institut Miftahul Huda Al-Azhar | | 6.1. | Table Installment of SPP in ISIF Cirebon | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 310.000 310.000 310.000 310.000 310.000 | 370.000 370.000 370.000 370.000 370.000 -- | 465.000 465.000 465.000 455.000 -- -- | 620.000 620.000 610.000 -- -- -- | 1.850.000 -- -- -- -- -- |
| 6.2. | Table Installment of SPP in ISIF Cirebon | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program - Department of Islamic Religious Education |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 350.000 350.000 350.000 350.000 350.000 | 410.000 410.000 410.000 410.000 410.000 -- | 515.000 515.000 515.000 505.000 -- -- | 685.000 685.000 680.000 -- -- -- | 2.050.000 -- -- -- -- -- |
| 7. | STIE Indocakti Malang - Indocakti Malang College of Economics | | 7.1. | Installment Table at STIE Indocakti Malang | | For High School/Vocational School, Associate Degree (D3), etc. Graduates Continuing to the Undergraduate Program (S1) - Wave I |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 400 000 400 000 400 000 400 000 400 000 400 000 | 1 995 000 -- -- -- -- -- |
| 7.2. | Installment Table at STIE Indocakti Malang | | For High School/Vocational School, Associate Degree (D3), etc. Graduates Continuing to the Undergraduate Program (S1) - Wave II |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 450 000 450 000 450 000 450 000 450 000 450 000 | 2 495 000 -- -- -- -- -- |
| 7.3. | Installment Table at STIE Indocakti Malang | | For High School/Vocational School, Associate Degree (D3), etc. Graduates Continuing to the Undergraduate Program (S1) - Wave II |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 500 000 500 000 500 000 500 000 500 000 500 000 | 2 795 000 -- -- -- -- -- |
| 8. | ISTA Jakarta - Institute of Science and Technology Al Kamal Jakarta | | 8.1. | ISTA SPP Installment Table | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600.000 600.000 600.000 600.000 600.000 600.000 | 720.000 720.000 720.000 720.000 720.000 -- | 900.000 900.000 900.000 900.000 -- -- | 1.200.000 1.200.000 1.200.000 -- -- -- | 3.600.000 -- -- -- -- -- |
| 8.2. | ISTA SPP Installment Table – Chemical | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 750.000 750.000 750.000 750.000 750.000 750.000 | 900.000 900.000 900.000 900.000 900.000 -- | 1.125.000 1.125.000 1.125.000 1.125.000 -- -- | 1.500.000 1.500.000 1.500.000 -- -- -- | 4.500.000 -- -- -- -- -- |
| 8.3. | ISTA SPP Installment Table – Pharmacy | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 | 1.440.000 1.440.000 1.440.000 1.440.000 1.440.000 -- | 1.800.000 1.800.000 1.800.000 1.800.000 -- -- | 2.400.000 2.400.000 2.400.000 -- -- -- | 7.200.000 -- -- -- -- -- |
| 9. | Universitas IVET Semarang - Ivet University Semarang | | 9.1. | Table of SPb Installments at Ivet University - Department of Civics Education, History, Economics, Geography, Science, Mathematics | | For high school graduates, vocational high school graduates, and equivalent proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37-45 46 | 100 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 78 000 108 000 | 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 152 000 144 000 -- -- -- -- | 303 000 303 000 303 000 303 000 303 000 303 000 303 000 303 000 303 000 303 000 303 000 307 000 -- -- -- -- -- -- -- -- -- - - -- | 910 000 910 000 910 000 910 000 -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- -- | 3.640.000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- -- -- |
| 9.2. | Table of SPb Installments at Ivet University - Department of Counseling Guidance, Environmental Science | | For High School, Vocational High School Graduates, equivalent proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37-45 46 | 100 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 84 000 | 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 209 000 -- -- -- -- | 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 426 000 -- -- -- -- -- -- -- -- -- - - -- | 1.300.000 1.300.000 1.300.000 1.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5 200 000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- -- -- |
| 9.3. | Table of SPb Installments at Ivet University - Islamic Education, PGMI | | For high school graduates, vocational high school graduates, and equivalent proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37-45 46 | 100 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 56 000 36 000 | 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 109 000 93 000 -- -- -- -- | 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 213 000 -- -- -- -- -- -- -- -- -- - - -- | 650.000 650.000 650.000 650.000 -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- -- | 2.600.000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- -- -- |
| 9.4. | Table of SPb Installments at Ivet University - Department of Informatics, Health Administration, Nutrition, Safety Engineering, Information Technology, Biomedical Science, Digital Business | | For high school graduates, vocational high school graduates, and equivalent proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37-45 46 | 100 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 114 000 84 000 | 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 217 000 209 000 -- -- -- -- | 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 434 000 426 000 -- -- -- -- -- -- -- -- -- - - -- | 1.300.000 1.300.000 1.300.000 1.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5 200 000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- -- -- |
| 9.5. | SPb Installment Table at Ivet University - Department of Ship Engineering, Shipbuilding Engineering, Ship Electrical Engineering | | For High School, Vocational High School Graduates, equivalent proceed to Diploma Three (D3) |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 100 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 128 000 98 000 | 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 190 000 180 000 -- -- | 380 000 380 000 380 000 380 000 380 000 380 000 380 000 380 000 380 000 380 000 380 000 370 000 -- -- -- -- -- -- -- -- -- | 1.138.000 1.138.000 1.138.000 1.136.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 4.550.000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- |
| 10. | Universitas Kahuripan Kediri - University of Kahuripan Kediri | | 10.1. | SPb Installment Table at KAHURIPAN - Department of Agrotechnology, PJKR, PPKN, Animal Husbandry, Electrical Engineering, Informatics Engineering, Civil Engineering, Management | | For SMU, SMK,, equivalent graduates continue to the S-1 Program |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 150.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 50.000 | 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 230.000 -- -- | 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 470.000 -- -- -- -- -- -- -- -- -- -- | 1.440.000 1.440.000 1.440.000 1.430.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.750.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
|
| 10.2. | SPb Installment Table at KAHURIPAN - Department of Agrotechnology, PJKR, PPKN, Animal Husbandry, Electrical Engineering, Informatics Engineering, Civil Engineering, Management | | For D3 Graduates, Polytechnics, equivalent proceed to the Undergraduate Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 150.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 320.000 | 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 470.000 -- -- -- -- -- -- | 825.000 825.000 825.000 825.000 825.000 825.000 800.000 -- -- -- -- -- -- -- -- -- -- -- | 1.437.500 1.437.500 1.437.500 1.437.500 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.750.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 10.3. | SPb Installment Table at KAHURIPAN - Accounting Department | | For SMU, SMK,, equivalent graduates continue to the S-1 Program |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 200.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 155.000 130.000 | 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 250.000 -- -- | 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 550.000 -- -- -- -- -- -- -- -- -- -- | 1.787.500 1.787.500 1.787.500 1.787.500 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 7.150.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
|
| 10.4. | SPb Installment Table at KAHURIPAN - Accounting Department | | For D3 Graduates, Polytechnics, equivalent proceed to the Undergraduate Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 200.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 390.000 | 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 600.000 550.000 -- -- -- -- -- -- | 1.025.000 1.025.000 1.025.000 1.025.000 1.025.000 1.025.000 1.000.000 -- -- -- -- -- -- -- -- -- -- -- | 1.787.500 1.787.500 1.787.500 1.787.500 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 7.150.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 11. | MH UNKRIS Jakarta - Master of Law Krisnadwipayana University Jakarta | | 11.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 12. | MIA UNKRIS Jakarta - Master of Administrative Science Krisnadwipayana University Jakarta | | 12.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 13. | MM Patria Artha Makassar - Master of Management Patria Artha University Makassar | | 13.1. | Free SPb Fee at Patria Artha University | | For S1 graduates continue to the Masters Program (S-2) |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 7 x | 4 x | 1 x | | 0 | 0 | 0 | 0 | 0 | 0 |
| 14. | MM STIE ABI Surabaya - Master of Manajemen STIE Artha Bodhi Surabaya | | 14.1. | Installment table at STIE Artha Bodhi Iswara | | For graduate S1 equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.070.000 1.070.000 1.070.000 1.070.000 1.070.000 | 950.000 950.000 950.000 950.000 950.000 -- | 4.750.000 -- -- -- -- -- |
| 15. | MM STIE GICI Business School - Master of Management STIE GICI | | 15.1. | Table Installment of SPb in STIE GICI | | For graduate S1 equivalent proceed to (S2 - Master of Management) |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 | 100.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 90.000 | 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 139.000 137.000 -- -- | 209.000 209.000 209.000 209.000 209.000 209.000 209.000 209.000 209.000 209.000 209.000 201.000 -- -- -- -- -- -- -- -- | 625.000 625.000 625.000 625.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 16. | MM UMIBA Jakarta - Master of Management, Mitra Bangsa University, Jakarta | | 16.1. | Table Installment of UKT in STIMAIMMI Jakarta | | For graduate S1 proceed to Magister Program - RPL |
| Months | The number and amount of installments | | 6 x | 5 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.950.000 1.950.000 1.950.000 1.950.000 1.950.000 1.950.000 | 2.035.000 2.035.000 2.035.000 2.035.000 2.035.000 -- | 3.850.000 3.850.000 3.850.000 -- -- -- | 11.525.000 -- -- -- -- -- |
| 16.2. | Table Installment of UKT in MM UMIBA | | For graduate S1 or equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 | 1.320.000 1.320.000 1.320.000 1.320.000 1.320.000 -- | 1.650.000 1.650.000 1.650.000 1.650.000 -- -- | 2.200.000 2.200.000 2.200.000 -- -- -- | 6.600.000 -- -- -- -- -- |
| 17. | MM UNKRIS Jakarta - Master of Management Krisnadwipayana University Jakarta | | 17.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 18. | S2 UIN Al-Azhaar Lubuklinggau - Master of Nusantara Islamic University Al-Azhaar Lubuklinggau | | 18.1. | Table Installment of UKT di Al-Azhaar Institute of Islamic Religion Lubuklinggau | | For S1 graduates, the equivalent continues to Postgraduate (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 925.000 915.000 915.000 915.000 915.000 915.000 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 -- | 1.375.000 1.375.000 1.375.000 1.375.000 -- -- | 1.834.000 1.833.000 1.833.000 -- -- -- | 5.500.000 -- -- -- -- -- |
| 19. | MPD UM SURABAYA - Master of Education University of Muhammadiyah Surabaya | | 19.1. | Table of Online Lecture Program Installments (P2O) in UMS - Islamic education (S2) | | For S1 graduates, the equivalent continues to Postgraduate Masters |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 | 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.026.000 1.012.000 | 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.368.000 1.354.000 -- -- | 2.051.000 2.051.000 2.051.000 2.051.000 2.051.000 2.051.000 2.051.000 2.051.000 2.051.000 2.051.000 2.051.000 2.049.000 -- -- -- -- -- -- -- -- | 6.153.000 6.153.000 6.153.000 6.151.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 24.610.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 19.2. | Table of Online Lecture Program Installments (P2O) in UMS - Indonesian Language and Literature Education (S2) | | For S1 graduates, the equivalent continues to Postgraduate Masters |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 | 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.058.000 | 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.416.000 -- -- | 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.143.000 -- -- -- -- -- -- -- -- | 6.440.000 6.440.000 6.440.000 6.440.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 25.760.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 20. | Universitas Mpu Tantular Jakar - University of Mpu Tantular Jakarta | | 20.1. | Table of Basic Fee Installments Per Semester for 5 Semesters (only in semesters I to V) | | For high school, vocational & D3 graduates, equivalent to continue to S1 |
| Months | The number and amount of installments | | 2x | 1x | 1 2 3 4 5 6 | -- -- 100 000 -- 100 000 -- | 200 000 -- -- -- -- -- |
| 21. | Mpu Tantular Kedoya Jakarta - Mpu Tantular Jakarta Kedoya | | 21.1. | Table of Basic Fee Installments Per Semester for 5 Semesters (only in semesters I to V) | | For high school, vocational & D3 graduates, equivalent to continue to S1 |
| Months | The number and amount of installments | | 2x | 1x | 1 2 3 4 5 6 | -- -- 100 000 -- 100 000 -- | 200 000 -- -- -- -- -- |
| 22. | S2 FT UMJ - Magister Teknik Kimia Fakultas Teknik UMJ | | 22.1. | Table of Basic Fee Installments Per Semester for 5 Semesters (only in semesters I to V) | | For high school, vocational & D3 graduates, equivalent to continue to S1 |
| Months | The number and amount of installments | | 2x | 1x | 1 2 3 4 5 6 | -- -- 100 000 -- 100 000 -- | 200 000 -- -- -- -- -- |
| 23. | MT UNKRIS Jakarta - Master of Engineering Krisnadwipayana University Jakarta | | 23.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 24. | UNAS PASIM - Pasim National University Bandung | | 24.1. | Table Installment of UKT in Pasim National University | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 2x | 1 x | 1 2 3 4 5 6 | 555.000 653.000 653.000 653.000 653.000 653.000 | 740.000 770.000 770.000 770.000 770.000 -- | 955.000 955.000 955.000 955.000 -- -- | 1.110.000 1.275.000 1.275.000 -- -- -- | 1.910.000 1.910.000 -- -- -- -- | 3.820.000 -- -- -- -- -- |
| 24.2. | Table Installment of UKT in Pasim National University | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 2x | 1 x | 1 2 3 4 5 6 | 555.000 555.000 555.000 555.000 555.000 555.000 | 666.000 666.000 666.000 666.000 666.000 -- | 832.500 832.500 832.500 832.500 -- -- | 1.110.000 1.110.000 1.110.000 -- -- -- | 1.650.000 1.650.000 -- -- -- -- | 3.330.000 -- -- -- -- -- |
| 24.3. | Table Installment of UKT in UNKRIS | | For graduate SMA / SMK, D3, equivalent proceed to D3 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 2x | 1 x | 1 2 3 4 5 6 | 555.000 573.000 573.000 573.000 573.000 573.000 | 684.000 684.000 684.000 684.000 684.000 -- | 855.000 855.000 855.000 855.000 -- -- | 1.140.000 1.140.000 1.140.000 -- -- -- | 1.710.000 1.710.000 -- -- -- -- | 3.420.000 -- -- -- -- -- |
| 25. | Universitas Patria Artha Makas - Patria Artha University Makassar | | 25.1. | Table Installment of SPb in Patria Artha University | | For graduate SMA, SMK, D1, D2, equivalent proceed to D3 |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 100.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 140.000 | 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 126.000 -- -- | 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 -- -- -- -- -- -- -- -- -- -- | 825.000 825.000 825.000 825.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 25.2. | Table Installment of SPb in Patria Artha University | | For graduate SMA, SMK, D1, D2, equivalent proceed to S1 |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 100.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 90.000 140.000 | 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 126.000 -- -- | 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 -- -- -- -- -- -- -- -- -- -- | 825.000 825.000 825.000 825.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 26. | Polnas Denpasar - National Polytechnic Denpasar Bali | | 26.1. | Table Installment of SPb P2K Programs in Polnas Denpasar Bali | | For graduate SMA equivalent proceed to D3 P2K Programs |
| Months | The number and amount of installments | | 36x | 24x | 18x | 12x | 4x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 200.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 152.000 120.000 | 100.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 210.000 -- -- | 305.000 305.000 305.000 305.000 305.000 .000.000 305.000 305.000 305.000 305.000 305.000 305.000 305.000 305.000 305.000 305.000 305.000 305.000 -- -- -- -- | 458.000 458.000 458.000 458.000 458.000 458.000 458.000 458.000 458.000 458.000 458.000 458.000 -- -- -- -- -- -- -- -- -- -- | 1.375.000 1.375.000 1.375.000 1.375.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 27. | Magister Universitas Buddhi Dh - Magister Universitas Buddhi Dharma | | 27.1. | UKT Table Installment at Buddhi Dharma University | | For Bachelor's Degree or equivalent graduates to continue to the Master's Program (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.530.000 1.530.000 1.530.000 1.530.000 1.530.000 | 1.830.000 1.830.000 1.830.000 1.830.000 1.830.000 -- | 2.300.000 2.300.000 2.300.000 2.250.000 -- -- | 3.050.000 3.050.000 3.050.000 -- -- -- | 9.150.000 -- -- -- -- -- |
| 28. | Magister Universitas Satyagama - Magister Universitas Satyagama Jakarta | | 28.1. | Table Installment of UKT at Satyagama University | | For Bachelor (S1) graduates to continue to the Master's Program (S2) - Semester I - III |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.000.000 960.000 960.000 960.000 960.000 960.000 | 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 -- | 1.450.000 1.450.000 1.450.000 1.450.000 -- -- | 2.000.000 2.000.000 1.800.000 -- -- -- | 5.800.000 -- -- -- -- -- |
| 28.2. | Table Installment of UKT at Satyagama University | | For Bachelor (S1) graduates to continue to the Master's Program (S2) - Semester IV etc. |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 625.000 625.000 625.000 625.000 625.000 625.000 | 750.000 750.000 750.000 750.000 750.000 -- | 938.000 938.000 938.000 936.000 -- -- | 1.250.000 1.250.000 1.250.000 -- -- -- | 3.750.000 -- -- -- -- -- |
| 29. | S2 UNKRIS Jakarta - Krisnadwipayana Jakarta University Masters | | 29.1. | Table Installment of UKT at Satyagama University | | For Bachelor (S1) graduates to continue to the Master's Program (S2) - Semester IV etc. |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 625.000 625.000 625.000 625.000 625.000 625.000 | 750.000 750.000 750.000 750.000 750.000 -- | 938.000 938.000 938.000 936.000 -- -- | 1.250.000 1.250.000 1.250.000 -- -- -- | 3.750.000 -- -- -- -- -- |
| 30. | S2 UNSURYA - Master of Aerospace University Marshal Suryadarma | | 30.1. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma | | For graduate S1 equivalent proceed to (S2 - Magister of Management and S2 - Master of Laws) |
| Months | The number and amount of installments | | 24x | 18 x | 12x | 4x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-24 | 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 | 400.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 320.000 -- | 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 -- -- -- -- -- -- -- | 1.500.000 1.500.000 1.500.000 1.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 6.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
|
| 31. | Universitas Satyagama - Satyagama University | | 31.1. | Table Installment of UKT at Satyagama University | | For SMA, SMK graduates, equivalent to continue to Diploma programs (D3) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 400.000 400.000 400.000 400.000 400.000 400.000 | 480.000 480.000 480.000 480.000 480.000 -- | 600.000 600.000 600.000 600.000 -- -- | 800.000 800.000 800.000 -- -- -- | 2.400.000 -- -- -- -- -- |
| 31.2. | Table Installment of UKT at Satyagama University | | For SMA, SMK graduates, equivalent to continue to undergraduate programs (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 400.000 400.000 400.000 400.000 400.000 400.000 | 480.000 480.000 480.000 480.000 480.000 -- | 600.000 600.000 600.000 600.000 -- -- | 800.000 800.000 800.000 -- -- -- | 2.400.000 -- -- -- -- -- |
| 31.3. | Table Installment of UKT at Satyagama University | | For Bachelor (S1) graduates to continue to the Master's Program (S2) |
| Months | The number and amount of installments | | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 599.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 700.000 701.000 | 1.500.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 -- -- -- -- -- -- | 3.125.000 3.125.000 3.125.000 3.125.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 4.500.000 4.000.000 4.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 31.4. | Table Installment of UKT at Satyagama University | | For Bachelor (S2) graduates proceed to the Doctoral (S3) Program - Semester I |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 5.000.000 5.000.000 5.000.000 5.000.000 5.000.000 5.000.000 | 6.000.000 6.000.000 6.000.000 6.000.000 6.000.000 -- | 7.500.000 7.500.000 7.500.000 7.500.000 -- -- | 10.000.000 10.000.000 10.000.000 -- -- -- | 30.000.000 -- -- -- -- -- |
| 31.5. | Table Installment of UKT at Satyagama University | | For Bachelor (S2) graduates proceed to the Doctoral (S3) Program Semester II & III |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 4.000.000 3.200.000 3.200.000 3.200.000 3.200.000 3.200.000 | 4.000.000 4.000.000 4.000.000 4.000.000 4.000.000 -- | 5.000.000 5.000.000 5.000.000 5.000.000 -- -- | 7.000.000 7.000.000 6.000.000 -- -- -- | 20.000.000 -- -- -- -- -- |
| 31.6. | Table Installment of UKT at Satyagama University | | For Bachelor (S2) graduates proceed to the Doctoral (S3) Program Semester IV |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.600.000 1.600.000 1.600.000 1.600.000 1.600.000 | 2.000.000 2.000.000 2.000.000 2.000.000 2.000.000 -- | 2.500.000 2.500.000 2.500.000 2.500.000 -- -- | 4.000.000 4.000.000 2.000.000 -- -- -- | 10.000.000 -- -- -- -- -- |
| 32. | STAN-IM - Sekolah Tinggi Ilmu Ekonomi STAN Indonesia Mandiri | | 32.1. | Table Installment of UKT at Satyagama University | | For Bachelor (S2) graduates proceed to the Doctoral (S3) Program Semester IV |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.600.000 1.600.000 1.600.000 1.600.000 1.600.000 | 2.000.000 2.000.000 2.000.000 2.000.000 2.000.000 -- | 2.500.000 2.500.000 2.500.000 2.500.000 -- -- | 4.000.000 4.000.000 2.000.000 -- -- -- | 10.000.000 -- -- -- -- -- |
| 33. | STBA Lia Yogyakarta - Lia Yogyakarta Foreign Language College | | 33.1. | Table Installment of UKT in STBA LIA YOGYAKARTA | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 650.000 610.000 610.000 610.000 610.000 610.000 | 740.000 740.000 740.000 740.000 740.000 -- | 925.000 925.000 925.000 925.000 -- -- | 1.250.000 1.250.000 1.200.000 -- -- -- | 3.700.000 -- -- -- -- -- |
| 33.2. | Table Installment of UKT in STBA LIA YOGYAKARTA | | For graduate SMA/SMK, D3, etc. proceed to Diploma Program (D3) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 650.000 610.000 610.000 610.000 610.000 610.000 | 740.000 740.000 740.000 740.000 740.000 -- | 925.000 925.000 925.000 925.000 -- -- | 1.250.000 1.250.000 1.200.000 -- -- -- | 3.700.000 -- -- -- -- -- |
| 34. | STIE GICI Business School Dep - STIE GICI Business School | | 34.1. | Table Installment of SPb in STIE GICI - Jatiwaringin Jakarta | | For graduate SMA, SMK, D1 equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 50.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 60.000 80.000 | 130.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 120.000 -- -- | 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 195.000 -- -- -- -- -- -- -- -- -- | 750.000 750.000 750.000 750.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 34.2. | Table Installment of SPb in STIE GICI - Jatiwaringin Jakarta | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 12x | 7x | 4x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 50.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 150.000 | 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 255.000 195.000 -- -- -- -- -- -- | 300.000 450.000 450.000 450.000 450.000 450.000 450.000 -- -- -- -- -- -- -- -- -- -- -- | 750.000 750.000 750.000 750.000 -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 34.3. | Table Installment of SPb in STIE GICI Bekasi - Employee class | | For graduate SMA, SMK, D1 equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 37 x | 12 x | 10 x | 5 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 - 23 24 25-35 36-37 | 30.000 45.000 45.000 45.000 45.000 45.000 45.000 45.000 45.000 45.000 45.000 45.000 65.000 65.000 65.000 65.000 | 137.000 137.000 137.000 137.000 137.000 137.000 137.000 137.000 137.000 137.000 137.000 143.000 -- -- -- -- | 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 -- -- -- -- -- -- | 330.000 330.000 330.000 330.000 330.000 -- -- -- -- -- -- -- -- -- -- -- | 1.650.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 34.4. | Table Installment of SPb in STIE GICI Bekasi - Employee class | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 10 x | 5 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 30.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 95.000 100.000 | 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 -- -- -- -- -- -- -- -- | 330.000 330.000 330.000 330.000 330.000 -- -- -- -- -- -- -- -- -- -- -- -- | 1.650.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 34.5. | Table of Online Lecture Program Installments (P2O) - STIE GICI Bekasi | | For graduate SMA, SMK equivalent proceed to S-1 Program (ONLINE Classes) |
| Months | The number and amount of installments | | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 | 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 100.000 | 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 150.000 -- -- -- -- -- -- -- -- | 300.000 300.000 300.000 300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 1.250.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 34.6. | Table Installment of SPb in STIE GICI - Depok, Employee class | | For graduate SMA, SMK, D3 equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 50.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 50.000 | 1.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 34.7. | Table Installment of SPb in STIE GICI - Depok, Employee class | | For graduate SMA, SMK, D3 D1 equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 50.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 50.000 | 1.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 34.8. | Table of SPb installments at STIE GICI Bogor | | For SMA, SMK, equivalent graduates proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 46 x | 36 x | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37-45 46 | 500 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 746 000 706 000 | 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 946 000 920 000 -- --) 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 000 1 420 .000 1.420.000 1.420.000 1.370.000 -- -- -- -- | 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 000 1 895 .000 1.815.000 -- -- -- -- -- -- | 2 836 000 2 836 000 2 836 000 2 836 000 2 836 000 2 836 000 2 836 000 2 836 000 2 836 000 2 836 000 2 836 000 2 834 000 -- -- -- -- -- -- -- -- -- -- -- -- | 8 508 000 8 508 000 8 508 000 8 507 000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 34 030 000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- -- -- | ) |
| 34.9. | Table of SPb installments at STIE GICI Bogor | | For D3/POLTEK/equivalent graduates proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 500 000 1 041 000 1 041 000 1 041 000 1 041 000 1 041 000 1 041 000 1 041 000 1 041 .000 1.041.000 1.041.000 1.041.000 1.041.000 1.041.000 1.041.000 1.041.000 1.041.000 1 034 000 | 1 516 000 1 516 000 1 516 000 1 516 000 1 516 000 1 516 000 1 516 000 1 516 000 1 516 000 1 516 000 1 516 000 1 514 000 -- -- -- -- -- -- | 4 548 000 4 548 000 4 548 000 4 546 000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 18 190 000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- |
| 35. | STIE ABI Surabaya - Artha Bodhi Iswara College of Economic Surabaya | | 35.1. | Installment table at STIE Artha Bodhi Iswara - Morning Class | | For High School,D3, Polytechnic graduates, etc. they proceed to P2K and Regular S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 400.000 400.000 400.000 400.000 400.000 | 480.000 480.000 480.000 480.000 480.000 -- | 600.000 600.000 600.000 600.000 -- -- | 800.000 800.000 800.000 -- -- -- | 2.400.000 -- -- -- -- -- |
| 35.2. | Installment table at STIE Artha Bodhi Iswara - Afternoon Class | | For High School,D3, Polytechnic graduates, etc. they proceed to P2K and Regular S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 400.000 400.000 400.000 400.000 400.000 | 480.000 480.000 480.000 480.000 480.000 -- | 600.000 600.000 600.000 600.000 -- -- | 800.000 800.000 800.000 -- -- -- | 2.400.000 -- -- -- -- -- |
| 35.3. | Installment table at STIE Artha Bodhi Iswara - Online Class | | For High School,D3, Polytechnic graduates, etc. they proceed to P2K and Regular S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 550.000 550.000 550.000 550.000 550.000 550.000 | 660.000 660.000 660.000 660.000 660.000 -- | 825.000 825.000 825.000 825.000 -- -- | 1.100.000 1.100.000 1.100.000 -- -- -- | 3.300.000 -- -- -- -- -- |
| 35.4. | Installment table at STIE Artha Bodhi Iswara | | For graduate S1 equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.070.000 1.070.000 1.070.000 1.070.000 1.070.000 | 950.000 950.000 950.000 950.000 950.000 -- | 4.750.000 -- -- -- -- -- |
| 36. | STIE PASIM Sukabumi - Pasim College of Economics Sukabumi | | 36.1. | Table Installment UKT in STIE PASIM | | For graduate SMA/SMK,D3, etc. proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 2 x | 1 x | 1 2 3 4 5 6 | 650.000 650.000 650.000 650.000 650.000 600.000 | 770.000 770.000 770.000 770.000 770.000 -- | 1.000.000 1.000.000 1.000.000 850.000 -- -- | 1.300.000 1.300.000 1.250.000 -- -- -- | 1.925.000 1.925.000 -- -- -- -- | 3.850.000 -- -- -- -- -- |
| 37. | STIESIA Surabaya - Indonesian College of Economics Surabaya | | 37.1. | Table Installment of DPP in STIESIA Surabaya Departement of Management, Accounting | | For graduate SMA, SMK, equivalent proceed to S1 |
| Months | The number and amount of installments | | 11 x | 2x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 | 3.500.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 | 3.500.000 3.500.000 -- -- -- -- -- -- -- -- -- -- | 3.000.000 -- -- -- -- -- -- -- -- -- -- -- |
| 38. | STIE Widya Darma Surabaya - College of Economic Widya Darma Surabaya | | 38.1. | Table Installment of SPb in STIE Widya Darma Surabaya | | For graduate SMA, SMK, equivalent proceed to S1 |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 100.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 90.000 | 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 -- -- | 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 -- -- -- -- -- -- -- -- -- -- | 600.000 600.000 600.000 600.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.400.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 38.2. | Table Installment of SPb in STIE Widya Darma Surabaya | | For graduate D3, Polytechnic, Academy proceed to S1 |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 100.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 140.000 | 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 200.000 -- -- -- -- -- -- | 360.000 340.000 340.000 340.000 340.000 340.000 340.000 -- -- -- -- -- -- -- -- -- -- -- | 600.000 600.000 600.000 600.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.400.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 39. | UBHINUS - University Of Bhinneka Nusantara | | 39.1. | Table Installment of SPb in UBHINUS | | For graduate SMA, SMK, equivalent proceed to S-1 |
| Months | The number and amount of installments | | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 | 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 | 1.500.000 1.500.000 1.500.000 1.500.000 -- -- -- -- -- -- -- -- | 6.000.000 -- -- -- -- -- -- -- -- -- -- -- |
| 39.2. | Table Installment of SPb in UBHINUS | | For graduate D3, Polytechnic, Academy, equivalent proceed to S-1 |
| Months | The number and amount of installments | | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 | 400.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 300.000 | 1.000.000 1.000.000 1.000.000 1.000.000 -- -- -- -- -- -- -- -- | 4.000.000 -- -- -- -- -- -- -- -- -- -- -- |
| 39.3. | Table Installment of SPb in STIKI Malang | | For graduate SMA, SMK, equivalent proceed to D-3 |
| Months | The number and amount of installments | | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 | 200.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 150.000 | 500.000 500.000 500.000 500.000 -- -- -- -- -- -- -- -- | 2.000.000 -- -- -- -- -- -- -- -- -- -- -- |
| 40. | Universitas Mitra Bangsa - Mitra Bangsa University, Jakarta | | 40.1. | Table Installment of UKT in UMIBA Jakarta | | For graduate SMA, SMK, equivalent proceed to S1 - RPL |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 6 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 | 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 710.000 680.000 | 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 945.000 -- -- | 1.420.000 1.420.000 1.420.000 1.420.000 1.420.000 1.420.000 1.420.000 1.420.000 1.420.000 1.420.000 1.420.000 1.390.000 -- -- -- -- -- -- -- -- | 2.835.000 2.835.000 2.835.000 2.835.000 2.835.000 2.835.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 17.010.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 40.2. | Table Installment of UKT in STIMAIMMI Jakarta | | For graduate S1 proceed to Magister Program - RPL |
| Months | The number and amount of installments | | 6 x | 5 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.950.000 1.950.000 1.950.000 1.950.000 1.950.000 1.950.000 | 2.035.000 2.035.000 2.035.000 2.035.000 2.035.000 -- | 3.850.000 3.850.000 3.850.000 -- -- -- | 11.525.000 -- -- -- -- -- |
| 40.3. | Table Installment of SPP in STIMAIMMI Jakarta - Employee Class A | | For graduate SMA/SMK, proceed to D3 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 375.000 375.000 375.000 375.000 375.000 375.000 | 450.000 450.000 450.000 450.000 450.000 -- | 570.000 570.000 570.000 540.000 -- -- | 750.000 750.000 750.000 -- -- -- | 2.250.000 -- -- -- -- -- |
| 40.4. | Table Installment of UKT in Universitas Mitra Bangsa Jakarta - Management Programs | | For graduate SMA/SMK, D3, etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 525.000 525.000 525.000 525.000 525.000 525.000 | 630.000 630.000 630.000 630.000 630.000 -- | 800.000 800.000 800.000 750.000 -- -- | 1.050.000 1.050.000 1.050.000 -- -- -- | 3.150.000 -- -- -- -- -- |
| 40.5. | Table Installment of UKT in Universitas Mitra Bangsa Jakarta | | For graduate SMA/SMK, D3, etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 450.000 422.000 422.000 422.000 422.000 422.000 | 512.000 512.000 512.000 512.000 512.000 -- | 640.000 640.000 640.000 640.000 -- -- | 860.000 860.000 840.000 -- -- -- | 2.560.000 -- -- -- -- -- |
| 40.6. | Table Installment of UKT in MM Universitas Mitra Bangsa Jakarta | | For graduate S1 or equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 | 1.320.000 1.320.000 1.320.000 1.320.000 1.320.000 -- | 1.650.000 1.650.000 1.650.000 1.650.000 -- -- | 2.200.000 2.200.000 2.200.000 -- -- -- | 6.600.000 -- -- -- -- -- |
| 41. | STT Bina Tunggal Bekasi - Bina Tunggal Bekasi College of Technology | | 41.1. | Table Installment of UKT in MM Universitas Mitra Bangsa Jakarta | | For graduate S1 or equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 | 1.320.000 1.320.000 1.320.000 1.320.000 1.320.000 -- | 1.650.000 1.650.000 1.650.000 1.650.000 -- -- | 2.200.000 2.200.000 2.200.000 -- -- -- | 6.600.000 -- -- -- -- -- |
| 42. | Universitas Tanri Abeng Jakart - TANRI ABENG UNIVERSITY Jakarta | | 42.1. | Admission Fee in TANRI ABENG UNIVERSITY Employee Class & Executive Class | | For graduate SMA, SMK, equivalent and graduate D3 proceed to S1 Program |
| Months | The number and amount of installments | | 12 x | 7 x | 5 x | 3 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 | 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 | 860.000 860.000 860.000 860.000 860.000 860.000 840.000 -- -- -- -- -- | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 -- -- -- -- -- -- -- | 2.000.000 2.000.000 2.000.000 -- -- -- -- -- -- -- -- -- | 6.000.000 -- -- -- -- -- -- -- -- -- -- -- |
| 43. | UAI - Universitas Al-Azhar Indonesia | | 43.1. | Tuition Fee per Tahun di TANRI ABENG UNIVERSITY Department of Accounting, Business Administration & Architecture | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 | 800.000 800.000 800.000 800.000 800.000 | 1.000.000 1.000.000 1.000.000 1.000.000 -- | 1.350.000 1.350.000 1.350.000 -- -- | 4.000.000 -- -- -- -- |
| 44. | Universitas Ubudiyah Indonesia - University of Ubudiyah Indonesia Aceh | | 44.1. | Table Installment SPb at Ubudiyah University Indonesia - PGSD Department and Pend. Computer Science (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37 38-45 46 | 300.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 65.000 90.000 | 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 135.000 145.000 -- -- -- -- -- | 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 280.000 -- -- -- -- -- -- -- -- -- -- -- -- -- | 820.000 820.000 820.000 790.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.250.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.2. | Table Installment SPb at Ubudiyah University Indonesia - PGSD Department and Pend. Computer Science (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 300.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 173.000 182.000 | 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 280.000 -- -- -- -- -- -- | 465.000 465.000 465.000 465.000 465.000 465.000 460.000 -- -- -- -- -- -- -- -- -- -- -- | 820.000 820.000 820.000 790.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.250.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.3. | Table Installment SPb at Ubudiyah University Indonesia - Department of Law (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37 38-45 46 | 400.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 200.000 | 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 105.000 -- -- -- -- -- | 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 -- -- -- -- -- -- -- -- -- -- -- -- -- | 975.000 975.000 975.000 975.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.900.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.4. | Table Installment SPb at Ubudiyah University Indonesia - Department of Law (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 400.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 140.000 | 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 -- -- -- -- -- -- | 560.000 560.000 560.000 560.000 560.000 560.000 540.000 -- -- -- -- -- -- -- -- -- -- -- | 975.000 975.000 975.000 975.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.900.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.5. | Table Installment SPb at Ubudiyah University Indonesia - Midwifery Department (D3) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (D3) |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 600.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 170.000 120.000 | 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 290.000 -- -- | 545.000 545.000 545.000 545.000 545.000 545.000 545.000 545.000 545.000 545.000 545.000 505.000 -- -- -- -- -- -- -- -- -- -- | 1.625.000 1.625.000 1.625.000 1.625.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 6.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.6. | Table Installment SPb at Ubudiyah University Indonesia - Midwifery Department (D4) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (D4) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37 38-45 46 | 600.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 205.000 130.000 | 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 320.000 -- -- -- -- -- | 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 785.000 -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.440.000 2.440.000 2.440.000 2.430.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 9.750.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.7. | Table Installment SPb at Ubudiyah University Indonesia - Midwifery Department (D4) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (D4) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 600.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 540.000 510.000 | 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 815.000 785.000 -- -- -- -- -- -- | 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 1.350.000 -- -- -- -- -- -- -- -- -- -- -- | 2.440.000 2.440.000 2.440.000 2.430.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 9.750.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.8. | Table Installment SPb at Ubudiyah University Indonesia - Department of Pharmacy (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 37 38-45 46 | 1.000.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 390.000 430.000 | 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 775.000 765.000 -- -- -- -- -- | 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.540.000 -- -- -- -- -- -- -- -- -- -- -- -- -- | 4.650.000 4.650.000 4.650.000 4.640.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 18.590.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.9. | Table Installment SPb at Ubudiyah University Indonesia - Department of Pharmacy (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 1.000.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.035.000 1.030.000 | 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.550.000 1.540.000 -- -- -- -- -- -- | 2.655.000 2.655.000 2.655.000 2.655.000 2.655.000 2.655.000 2.660.000 -- -- -- -- -- -- -- -- -- -- -- | 4.650.000 4.650.000 4.650.000 4.640.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 18.590.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.10. | Table Installment SPb at Ubudiyah University Indonesia - Department of Nutrition (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 400.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 93.000 58.000 | 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 180.000 -- -- | 380.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 190.000 -- -- -- -- -- -- -- -- -- -- | 1.140.000 1.140.000 1.140.000 1.130.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 4.550.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.11. | Table Installment SPb at Ubudiyah University Indonesia - Department of Nutrition (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 400.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 245.000 230.000 | 380.000 380.000 380.000 380.000 380.000 380.000 380.000 380.000 380.000 380.000 380.000 370.000 -- -- -- -- -- -- | 650.000 650.000 650.000 650.000 650.000 650.000 650.000 -- -- -- -- -- -- -- -- -- -- -- | 1.140.000 1.140.000 1.140.000 1.130.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 4.550.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.12. | Table Installment SPb at Ubudiyah University Indonesia - Department of Psychology (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 300.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 120.000 | 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 135.000 -- -- | 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 365.000 -- -- -- -- -- -- -- -- -- -- | 1.040.000 1.040.000 1.040.000 1.040.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 4.160.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.13. | Table Installment SPb at Ubudiyah University Indonesia - Department of Psychology (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 300.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 230.000 180.000 | 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 345.000 365.000 -- -- -- -- -- -- | 595.000 595.000 595.000 595.000 595.000 595.000 590.000 -- -- -- -- -- -- -- -- -- -- -- | 1.040.000 1.040.000 1.040.000 1.040.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 4.160.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.14. | Table Installment SPb at Ubudiyah University Indonesia - Department of Public Health, Management, Accounting (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 400.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 200.000 | 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 105.000 -- -- | 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 -- -- -- -- -- -- -- -- -- -- | 975.000 975.000 975.000 975.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.900.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.15. | Table Installment SPb at Ubudiyah University Indonesia - Department of Public Health, Management, Accounting (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 400.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 140.000 | 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 -- -- -- -- -- -- | 560.000 560.000 560.000 560.000 560.000 560.000 540.000 -- -- -- -- -- -- -- -- -- -- -- | 975.000 975.000 975.000 975.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.900.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.16. | Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Informatics, Information Systems (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 400.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 75.000 200.000 | 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 105.000 -- -- | 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 -- -- -- -- -- -- -- -- -- -- | 975.000 975.000 975.000 975.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.900.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.17. | Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Informatics, Information Systems (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 400.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 210.000 140.000 | 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 -- -- -- -- -- -- | 560.000 560.000 560.000 560.000 560.000 560.000 540.000 -- -- -- -- -- -- -- -- -- -- -- | 975.000 975.000 975.000 975.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.900.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.18. | Table Installment SPb at Ubudiyah University Indonesia - Department of Information Management, Computerized Accounting (D3) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (D3) |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 400.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 | 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 105.000 -- -- | 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 325.000 -- -- -- -- -- -- -- -- -- -- | 975.000 975.000 975.000 975.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.900.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.19. | Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Civil, Architecture (S1) | | For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 500.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 105.000 80.000 | 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 220.000 140.000 -- -- | 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 360.000 -- -- -- -- -- -- -- -- -- -- | 1.300.000 1.300.000 1.300.000 1.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.200.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.20. | Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Civil, Architecture (S1) | | For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 500.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 280.000 220.000 | 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 440.000 360.000 -- -- -- -- -- -- | 750.000 750.000 750.000 750.000 750.000 750.000 700.000 -- -- -- -- -- -- -- -- -- -- -- | 1.300.000 1.300.000 1.300.000 1.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.200.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 44.21. | Table of SPb Installments at the University of Ubudiyah Indonesia - PAUD Teacher Education Department (S1) - RPL | | For graduates of SMA, SMK, D3, Polytechnic, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 8 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 | 400 000 370 000 370 000 370 000 370 000 370 000 370 000 370 000 | 748 000 748 000 748 000 746 000 -- -- -- -- | 2 990 000 -- -- -- -- -- -- -- |
| 44.22. | Table of SPb Installments at the University of Ubudiyah Indonesia - Department of Information Systems & Information Engineering (S1) - RPL | | For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 8 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 | 800.000 510.000 510.000 508.000 508.000 508.000 508.000 508.000 | 1 090 000 1 090 000 1 090 000 1 090 000 -- -- -- -- | 4 360 000 -- -- -- -- -- -- -- |
| 44.23. | Table of SPb installments at the University of Ubudiyah Indonesia - Department of Pharmacy (S1) - RPL | | For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 8 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 | 2 200 000 2 158 000 2 158 000 2 158 000 2 158 000 2 158 000 2 158 000 2 152 000) 4 325 000 4 325 000 4 325 000 4 325 000 -- -- -- -- | 17 300 000 -- -- -- -- -- -- -- | ) |
| 44.24. | Table of SPb Installments at the University of Ubudiyah Indonesia - Department of Public Health (S1) - RPL | | For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 8 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 | 500 000 472 000 472 000 472 000 472 000 472 000 472 000 468 000 | 950 000 950 000 950 000 950 000 -- -- -- -- | 3 800 000 -- -- -- -- -- -- -- |
| 44.25. | Table of SPb installments at the University of Ubudiyah Indonesia - Department of Nutrition (S1) - RPL | | For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1) |
| Months | The number and amount of installments | | 8 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 | 650 000 650 000 650 000 650 000 650 000 650 000 650 000 650 000 | 1 300 000 1 300 000 1 300 000 1 300 000 -- -- -- -- | 5 200 000 -- -- -- -- -- -- -- |
| 45. | UHAMZAH Medan - University of Amir Hamzah Medan | | 45.1. | Table Installment of SPb in UHAMZAH - University of Amir Hamzah | | For graduate SMA, SMK, etc. proceed to S-1 Program |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 50.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 55.000 80.000 | 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 45.000 -- -- | 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 165.000 -- -- -- -- -- -- -- -- -- -- | 500.000 500.000 500.000 500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 45.2. | Table Installment of SPb in UHAMZAH - University of Amir Hamzah | | For graduate D3, Polytechnic, Academy proceed to S-1 Program |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 50.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 85.000 90.000 | 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 125.000 -- -- -- -- -- -- | 215.000 215.000 215.000 215.000 215.000 215.000 210.000 -- -- -- -- -- -- -- -- -- -- -- | 375.000 375.000 375.000 375.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 1.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 46. | UICI - Insan Cita Indonesia University | | 46.1. | Table Installment SPP in UHAMZAH - University of Amir Hamzah | | For graduate SMA/SMK,D3, etc. proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 300.000 690.000 690.000 690.000 690.000 690.000 | 750.000 750.000 750.000 750.000 750.000 -- | 938.000 938.000 938.000 936.000 -- -- | 1.250.000 1.250.000 1.250.000 -- -- -- | 3.750.000 -- -- -- -- -- |
| 47. | UM Palangkaraya - Muhammadiyah University of Palangkaraya | | 47.1. | Table Installment of SPb in College of University of Muhammadiyah Palangkaraya - Semester I s/d III | | For graduate SMA, SMK, equivalent proceed to S1 |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 - 17 18 | 150.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 145.000 | 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 170.000 -- -- | 365.000 365.000 365.000 365.000 365.000 365.000 345.000 -- -- -- -- -- -- -- | 635.000 635.000 635.000 630.000 -- -- -- -- -- -- -- -- -- -- | 2.535.000 -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 47.2. | Table Installment of SPb in College of University of Muhammadiyah Palangkaraya - Semester IV s/d VIII | | For graduate SMA, SMK, equivalent proceed to S1 |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 - 17 18 | 150.000 185.000 185.000 185.000 185.000 185.000 185.000 185.000 185.000 185.000 185.000 185.000 185.000 140.000 | 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 270.000 280.000 -- -- | 465.000 465.000 465.000 465.000 465.000 465.000 460.000 -- -- -- -- -- -- -- | 815.000 815.000 815.000 805.000 -- -- -- -- -- -- -- -- -- -- | 3.250.000 -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 47.3. | Table Installment of SPb in College of University of Muhammadiyah Palangkaraya | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 150.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 140.000 145.000 | 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 215.000 170.000 -- -- -- -- -- -- | 365.000 365.000 365.000 365.000 365.000 365.000 345.000 -- -- -- -- -- -- -- -- -- -- -- | 635.000 635.000 635.000 630.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.535.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 48. | Universitas Muhammadiyah Jakar - University of Muhammadiyah Jakarta | | 48.1. | Table Installment of SPb in UMJ - AGRICULTURAL FACULTY | | For graduate SMA, SMK, etc. proceed to S1 |
| Months | The number and amount of installments | | 46 x | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 100.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 72.000 32.000 | 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 138.000 126.000 -- -- | 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 184.000 172.000 -- -- -- -- | 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 -- -- -- -- -- -- -- -- -- -- | 825.000 825.000 825.000 825.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 48.2. | Table Installment of SPb in UMJ - AGRICULTURAL FACULTY | | For graduate D3, Polytechnic, Academy proceed to S1 |
| Months | The number and amount of installments | | 18 x | 12 x | 7 x | 4 x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 100.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 189.000 176.000 | 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 275.000 -- -- -- -- -- -- | 472.000 472.000 472.000 472.000 472.000 472.000 468.000 -- -- -- -- -- -- -- -- -- -- -- | 825.000 825.000 825.000 825.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 3.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 48.3. | Table Installment of SPb in FISIP - UMJ | | For graduate SMA, SMK, etc. proceed to S-1 |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-44 45 46 | 250.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 50.000 | 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 335.000 295.000 -- -- -- | 670.000 670.000 670.000 670.000 670.000 670.000 670.000 670.000 670.000 670.000 670.000 630.000 -- -- -- -- -- -- -- -- -- -- -- | 2.000.000 2.000.000 2.000.000 2.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 8.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 48.4. | Table Installment of SPb in FISIP UMJ S2 | | For graduate S1 equivalent proceed to S-2 |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 | 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 | 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 200.000 200.000 -- -- | 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 -- -- -- -- -- -- -- -- | 1.500.000 1.500.000 1.500.000 1.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 6.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 49. | Universitas Mochammad Sroedji - Universitas Mochammad Sroedji Jember | | 49.1. | Free SPb Fee in University of Mochammad Sroedji Jember | | For graduate SMA, SMK, equivalent proceed to S1 |
| Months | The number and amount of installments | | | 1 | FREE |
| 50. | UNAKI Semarang - University of AKI Semarang | | 50.1. | Table Installment of UKT in UNAKI Semarang - Wave I (1 October - 30 November 2024) | | For graduate SMA/SMK to S1 Program - Semester 1 |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 550.000 745.000 745.000 745.000 745.000 745.000 | 4.475.000 -- -- -- -- -- |
| 50.2. | Table Installment of UKT in UNAKI Semarang - Wave II (1 December 2024 - 31 January 2025) | | For graduate SMA/SMK to S1 Program - Semester 1 |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 650.000 745.000 745.000 745.000 745.000 745.000 | 4.475.000 -- -- -- -- -- |
| 50.3. | Table Installment of UKT in UNAKI Semarang - Wave III (1 February - 31 March 2025) | | For graduate SMA/SMK to S1 Program - Semester 1 |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 750.000 745.000 745.000 745.000 745.000 745.000 | 4.475.000 -- -- -- -- -- |
| 50.4. | Table Installment of UKT in UNAKI Semarang | | For graduate SMA/SMK to S1 Program - Semester 2 until 8 |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 750.000 745.000 745.000 745.000 745.000 745.000 | 4.475.000 -- -- -- -- -- |
| 50.5. | Table Installment of UKT in UNAKI Semarang | | For graduate D3 to S1 Program - Semester 1 until 8 |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 725.000 725.000 725.000 725.000 725.000 725.000 | 4.350.000 -- -- -- -- -- |
| 51. | UNAS - National Univeristy | | 51.1. | Installment Table for UKT at Universitas Nasional - Management Major | | For High School/Vocational, Diploma, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 2 000 000 1 915 000 1 915 000 1 915 000 1 915 000 1 915 000 | 2 315 000 2 315 000 2 315 000 2 315 000 2 315 000 -- | 2 900 000 2 900 000 2 875 000 -- -- -- | 3 860 000 3 860 000 3 855 000 -- -- -- | 11 575 000 -- -- -- -- -- |
| 52. | UNDARIS Ungaran Semarang - University of Islamic Centre Darul Ulum Sudirman GUPPI Ungaran Semaran | | 52.1. | SPb installment table in UNDARIS | | For SMA, SMK, D3 equivalent graduates proceed to Bachelor Program (S-1) |
| Months | The number and amount of installments | | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12) 375 000 250 000 250 000 250 000 250 000 250 000 250 000 250 000 250 000 250 000 250 000 250 000) 800 000 775 000 775 000 775 000 -- -- -- -- -- -- - - -- | 3.125.000 -- -- -- -- -- -- -- -- - - -- | ) | |
| 52.2. | SPb installment table in UNDARIS | | For SMA, SMK, D3 equivalent graduates proceed to Bachelor Program (S-1) RPL |
| Months | The number and amount of installments | | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 | 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 | 750.000 750.000 750.000 750.000 -- -- -- -- -- -- -- -- | 3.000.000 -- -- -- -- -- -- -- -- -- -- |
| 52.3. | SPb installment table in UNDARIS | | For S1 equivalent graduates proceed to Magister Programs (S-2) RPL - Magister of Law |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 | 250.000 250.000 250.000 250.000 250.000 250.000 700.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 150.000 | 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 340.000 220.000 -- -- -- -- -- -- | 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 -- -- -- -- -- -- -- -- -- -- -- -- | 1.500.000 1.500.000 1.500.000 1.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 6.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 52.4. | SPb installment table in UNDARIS | | For S1 equivalent graduates proceed to Magister Programs (S-2) RPL - Magister of Islamic Religious Education |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 | 250.000 240.000 240.000 240.000 240.000 240.000 700.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 240.000 270.000 | 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 190.000 -- -- -- -- -- -- | 490.000 490.000 490.000 490.000 490.000 490.000 490.000 490.000 490.000 490.000 490.000 410.000 -- -- -- -- -- -- -- -- -- -- -- -- | 1.450.000 1.450.000 1.450.000 1.450.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.800.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 53. | UNIBA Banyuwangi - Universitas PGRI Banyuwangi | | 53.1. | Instalment Tables at the University of PGRI Banyuwangi University - PPKN Education Department, History Education, BK Education, Biology Education, English Education, PJKR, Mathematics Education | | For Vocational High School Graduates, D3 proceed to S1 RPL |
| Months | The number and amount of installments | | 18 x | 12 x | 6 x | 1 x | 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 | 375.000 375.000 375.000 375.000 375.000 375.000 375.000 375.000 375.000 375.000 375.000 375.000 -- -- -- -- -- -- | 750.000 750.000 750.000 750.000 750.000 750.000 -- -- -- -- -- -- -- -- -- -- -- -- | 4.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | ) |
| 54. | Universitas Gresik - Gresik University | | 54.1. | Installment Table at Universitas Gresik | | For High School/Vocational School Graduates/Transfers to S1 in Management and Law Studies |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 900.000 850.000 850.000 850.000 850.000 850.000 | 1.030.000 1.030.000 1.030.000 1.030.000 1.030.000 -- | 1.300.000 1.300.000 1.300.000 1.250.000 -- -- | 1.750.000 1.750.000 1.650.000 -- -- -- | 5.150.000 -- -- -- -- -- |
| 54.2. | Installment Table at Universitas Gresik | | For D3 Graduates to S1 in Management and Law Studies |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.050.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 | 1.210.000 1.210.000 1.210.000 1.210.000 1.210.000 -- | 1.550.000 1.550.000 1.550.000 1.400.000 -- -- | 2.050.000 2.050.000 1.950.000 -- -- -- | 6.050.000 -- -- -- -- -- |
| 54.3. | Installment Table at Universitas Gresik | | For High School/Vocational School Graduates/Transfers to S1 in Civil Engineering & Mechanical Engineering |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 900.000 810.000 810.000 810.000 810.000 810.000 | 990.000 990.000 990.000 990.000 990.000 -- | 1.300.000 1.300.000 1.300.000 1.050.000 -- -- | 1.650.000 1.650.000 1.650.000 -- -- -- | 4.950.000 -- -- -- -- -- |
| 54.4. | Installment Table at Universitas Gresik | | For D3 Graduates to S1 in Civil Engineering & Mechanical Engineering |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.000.000 970.000 970.000 970.000 970.000 970.000 | 1.170.000 1.170.000 1.170.000 1.170.000 1.170.000 -- | 1.500.000 1.500.000 1.500.000 1.350.000 -- -- | 1.950.000 1.950.000 1.950.000 -- -- -- | 5.850.000 -- -- -- -- -- |
| 54.5. | Installment Table at Universitas Gresik | | For High School/Vocational School Graduates/Transfers to S1 in English Literature & Educational Administration |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 700.000 650.000 650.000 650.000 650.000 650.000 | 790.000 790.000 790.000 790.000 790.000 -- | 1.000.000 1.000.000 1.000.000 950.000 -- -- | 1.350.000 1.350.000 1.250.000 -- -- -- | 3.950.000 -- -- -- -- -- |
| 54.6. | Installment Table at Universitas Gresik | | For D3 Graduates to S1 in English Literature & Educational Administration |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 850.000 800.000 800.000 800.000 800.000 800.000 | 970.000 970.000 970.000 970.000 970.000 -- | 1.250.000 1.250.000 1.250.000 1.100.000 -- -- | 1.650.000 1.650.000 1.550.000 -- -- -- | 4.850.000 -- -- -- -- -- |
| 54.7. | Installment Table at Universitas Gresik | | For High School/Vocational School Graduates/Transfers to S1 in Accounting |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 900.000 830.000 830.000 830.000 830.000 830.000 | 1.010.000 1.010.000 1.010.000 1.010.000 1.010.000 -- | 1.300.000 1.300.000 1.300.000 1.150.000 -- -- | 1.700.000 1.700.000 1.650.000 -- -- -- | 5.050.000 -- -- -- -- -- |
| 54.8. | Installment Table at Universitas Gresik | | For D3 Graduates to S1 in Accounting |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.000.000 990.000 990.000 990.000 990.000 990.000 | 1.190.000 1.190.000 1.190.000 1.190.000 1.190.000 -- | 1.500.000 1.500.000 1.500.000 1.450.000 -- -- | 2.000.000 2.000.000 1.950.000 -- -- -- | 5.950.000 -- -- -- -- -- |
| 54.9. | Installment Table at Universitas Gresik | | For High School/Vocational School Graduates/Transfers to S1 in Computer Science |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 900.000 790.000 790.000 790.000 790.000 790.000 | 970.000 970.000 970.000 970.000 970.000 -- | 1.250.000 1.250.000 1.250.000 1.100.000 -- -- | 1.650.000 1.650.000 1.550.000 -- -- -- | 4.850.000 -- -- -- -- -- |
| 54.10. | Installment Table at Universitas Gresik | | For D3 Graduates to S1 in Computer Science |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 950.000 950.000 950.000 950.000 950.000 950.000 | 1.140.000 1.140.000 1.140.000 1.140.000 1.140.000 -- | 1.425.000 1.425.000 1.425.000 1.425.000 -- -- | 1.900.000 1.900.000 1.900.000 -- -- -- | 5.700.000 -- -- -- -- -- |
| 55. | UNISA Kuningan Jawa Barat - Islamic University of Al-Ihya Kuningan | | 55.1. | Table Installment of SPb in UNISA - (Islamic University of Al-Ihya) | | For graduate SMA, SMK, D3 / Polytechnic, equivalent proceed to S-1 Program |
| Months | The number and amount of installments | | 18 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13-17 18 19-23 24 | 150.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 175.000 225.000 | 250.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 215.000 -- -- | 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 375.000 -- -- -- -- | 1.000.000 1.075.000 1.075.000 1.075.000 -- -- -- -- -- -- -- -- -- -- -- -- |
| 55.2. | Table Installment of SPb in UNISA - (Islamic University of Al-Ihya) | | For graduate D3, Polytechnic, Academy proceed to S1 |
| Months | The number and amount of installments | | 18 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13-17 18 | 250.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 235.000 215.000 | 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 375.000 -- -- | 1.000.000 1.075.000 1.075.000 1.075.000 -- -- -- -- -- -- -- -- -- -- | 4.225.000 -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 55.3. | Table of SPb installments at UNISA - (Al-Ihya Islamic University) | | For S1 graduates proceed to (S2) Program |
| Months | The number and amount of installments | | 18 x | 12 x | 4 x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13-17 18 | 150 000 185 000 185 000 185 000 185 000 185 000 185 000 185 000 185 000 185 000 185 000 185 000 185 000 140 000 | 271 000 271 000 271 000 271 000 271 000 271 000 271 000 271 000 271 000 271 000 271 000 269 000 -- -- | 815 000 815 000 815 000 805 000 -- -- -- -- -- -- - - -- -- -- | 3 250 000 -- -- -- -- -- -- -- -- - - -- -- -- -- |
| 56. | Universitas LIA - University of LIA | | 56.1. | Tabel Angsuran UKT di Universitas Lia | | Untuk Lulusan SMA, SMK, D3, sederajat melanjutkan ke Sarjana (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 750.000 750.000 750.000 750.000 750.000 750.000 | 900.000 900.000 900.000 900.000 900.000 -- | 1.125.000 1.125.000 1.125.000 1.125.000 -- -- | 1.500.000 1.500.000 1.500.000 -- -- -- | 4.500.000 -- -- -- -- -- |
| 56.2. | Tabel Angsuran UKT di Universitas Lia | | Untuk Lulusan SMA, SMK, D3, sederajat melanjutkan ke Sarjana (S1) majoring in English & Japanese |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 2.250.000 2.250.000 750.000 750.000 750.000 750.000 | 2.400.000 2.400.000 900.000 900.000 900.000 -- | 2.625.000 2.625.000 1.125.000 1.125.000 -- -- | 3.000.000 3.000.000 1.500.000 -- -- -- | 7.500.000 -- -- -- -- -- |
| 57. | UNKRIS Jakarta - University of Krisnadwipayana Jakarta | | 57.1. | Table Installment of UKT in UNKRIS - Faculty of Engineering | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.100.000 1.010.000 1.010.000 1.010.000 1.010.000 1.010.000 | 1.230.000 1.230.000 1.230.000 1.230.000 1.230.000 -- | 1.538.000 1.538.000 1.538.000 1.536.000 -- -- | 2.050.000 2.050.000 2.050.000 -- -- -- | 6.150.000 -- -- -- -- -- |
| 57.2. | Table Installment of UKT in UNKRIS | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.185.000 1.185.000 1.185.000 1.185.000 1.185.000 | 1.485.000 1.485.000 1.485.000 1.485.000 1.485.000 -- | 1.900.000 1.900.000 1.900.000 1.725.000 -- -- | 2.475.000 2.475.000 2.475.000 -- -- -- | 7.425.000 -- -- -- -- -- |
| 57.3. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 58. | UNLIP - Universitas Linggabuana PGRI Sukabumi | | 58.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 59. | UNSURYA Jakarta - University of Dirgantara Marsekal Suryadarma | | 59.1. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma - Department of Management, Accounting, Law, Electrical Engineering | | For graduate SMA, SMK, D1 equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 150.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 127.000 112.000 | 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 244.000 238.000 -- -- | 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 482.000 -- -- -- -- -- -- -- -- -- -- | 1.463.000 1.463.000 1.463.000 1.461.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.860.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.2. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma - Department of Management, Accounting, Law, Electrical Engineering | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 12x | 7x | 4x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 150.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 334.000 | 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 488.000 482.000 -- -- -- -- -- -- | 836.000 836.000 836.000 836.000 836.000 836.000 834.000 -- -- -- -- -- -- -- -- -- -- -- | 1.463.000 1.463.000 1.463.000 1.461.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.850.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.3. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma - Industrial Engineering Department | | For graduate SMA, SMK, D1 equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 100.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 114.000 84.000 | 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 209.000 -- -- | 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 426.000 -- -- -- -- -- -- -- -- -- -- | 1.300.000 1.300.000 1.300.000 1.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.200.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.4. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma - Industrial Engineering Department | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 12x | 7x | 4x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 100.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 | 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 434.000 426.000 -- -- -- -- -- -- | 743.000 743.000 743.000 743.000 743.000 743.000 742.000 -- -- -- -- -- -- -- -- -- -- -- | 1.300.000 1.300.000 1.300.000 1.300.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 5.200.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.5. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma - Information Systems Department | | For graduate SMA, SMK, D1 equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 46 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-45 46 | 100.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 56.000 36.000 | 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 109.000 93.000 -- -- | 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 213.000 -- -- -- -- -- -- -- -- -- -- | 650.000 650.000 650.000 650.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.600.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.6. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma - Information Systems Department | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 18 x | 12x | 7x | 4x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 | 100.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 148.000 132.000 | 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 217.000 426.000 -- -- -- -- -- -- | 372.000 372.000 372.000 372.000 372.000 372.000 368.000 -- -- -- -- -- -- -- -- -- -- -- | 650.000 650.000 650.000 650.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 2.600.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.7. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma | | For graduate S1 equivalent proceed to (S2 - Magister of Management and S2 - Master of Laws) |
| Months | The number and amount of installments | | 24x | 18 x | 12x | 4x | 1x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-24 | 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 250.000 | 400.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 330.000 320.000 -- | 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 -- -- -- -- -- -- -- | 1.500.000 1.500.000 1.500.000 1.500.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 6.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
|
| 59.8. | Table of SPb installments at Dirgantara Marshal Suryadarma University - Informatics Management Department | | For SMA, SMK, equivalent graduates proceed to Diploma (D3) |
| Months | The number and amount of installments | | 36 x | 24 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 25-35 36 | 100 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 105 000 80 000 | 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 157 000 139 000 -- -- | 313 000 313 000 313 000 313 000 313 000 313 000 313 000 313 000 313 000 313 000 313 000 307 000 -- -- -- -- -- -- -- -- -- --) 938 000 938 000 938 000 936 000 -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- | 3 750 000 -- -- -- -- -- -- -- -- - - -- -- -- -- -- -- -- -- -- - - -- -- | ) |
| 59.9. | Table of SPb installments at Dirgantara Marshal Suryadarma University - Informatics Management Department RPL Programs | | For SMA, SMK, equivalent graduates proceed to Diploma (D3) |
| Months | The number and amount of installments | | 24 x | 12 x | 10 x | 7 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13-23 24 | 500.000 200.000 2000.000 2000.000 2000.000 2000.000 2000.000 2000.000 2000.000 2000.000 2000.000 200.000 200.000 100.000 | 500.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 410.000 400.000 -- -- | 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 -- -- -- -- | 715.000 715.000 715.000 715.000 715.000 715.000 710.000 -- -- -- -- -- -- -- | 1.250.000 1.250.000 1.250.000 1.250.000 -- -- -- -- -- -- -- -- -- -- | 5.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.10. | Table of SPb installments at Dirgantara Marshal Suryadarma University - Industrial Engineering RPL Programs | | Untuk Lulusan SMA, SMK, sederajat melanjutkan ke (S1) |
| Months | The number and amount of installments | | 24 x | 12 x | 10 x | 7 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13-23 24 | 200.000 166.000 166.000 166.000 166.000 166.000 166.000 166.000 166.000 166.000 166.000 166.000 166.000 148.000 | 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 350.000 -- -- | 400.000 400.000 400.000 400.000 400.000 400.000 400.000 400.000 400.000 400.000 -- -- -- -- | 572.000 572.000 572.000 572.000 572.000 572.000 568.000 -- -- -- -- -- -- -- | 1.000.000 1.000.000 1.000.000 1.000.000 -- -- -- -- -- -- -- -- -- -- | 4.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.11. | Table of SPb installments at Dirgantara Marshal Suryadarma University- Jurusan Teknik Elektro Program RPL | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 24 x | 12 x | 10 x | 7 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13-23 24 | 750.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 440.000 | 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 -- -- | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 -- -- -- -- | 1.720.000 1.720.000 1.720.000 1.720.000 1.720.000 1.720.000 1.680.000 -- -- -- -- -- -- -- | 3.000.000 3.000.000 3.000.000 3.000.000 -- -- -- -- -- -- -- -- -- -- | 12.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.12. | Table of SPb installments at Dirgantara Marshal Suryadarma University- Jurusan Teknik Elektro Program RPL | | For graduate D3, Polytechnic, etc proceed to S1 Program |
| Months | The number and amount of installments | | 24 x | 12 x | 10 x | 7 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13-23 24 | 750.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 480.000 440.000 | 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 -- -- | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 -- -- -- -- | 1.720.000 1.720.000 1.720.000 1.720.000 1.720.000 1.720.000 1.680.000 -- -- -- -- -- -- -- | 3.000.000 3.000.000 3.000.000 3.000.000 -- -- -- -- -- -- -- -- -- -- | 12.000.000 -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 59.13. | Table Installment of SPb in University of Dirgantara Marsekal Suryadarma | | For graduate S1 equivalent proceed to (S2 - Magister of Management RPL Programs) |
| Months | The number and amount of installments | | 12 x | 10 x | 7 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 | 1.200.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 | 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 -- -- | 1.750.000 1.750.000 1.750.000 1.750.000 1.750.000 1.750.000 1.750.000 -- -- -- -- -- | 2.250.000 2.400.000 2.400.000 2.200.000 -- -- -- -- -- -- -- -- | 7.000.000 -- -- -- -- -- -- -- -- -- -- -- |
| 60. | Universitas Teknologi Nusantar - Nusantara Technology University | | 60.1. | Free SPb Fee in Nusantara Technology University | | For graduate SMA, SMK, equivalent proceed to S1 |
| Months | The number and amount of installments | | | 1 | FREE |
| 61. | Universitas Wijaya Kusuma Sura - Wijaya Kusuma University Surabaya | | 61.1. | Table Installment of UKT in Wijaya Kusuma University Surabaya | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 | 1.440.000 1.440.000 1.440.000 1.440.000 1.440.000 -- | 1.800.000 1.800.000 1.800.000 1.800.000 -- -- | 2.400.000 2.400.000 2.400.000 -- -- -- | 7.200.000 -- -- -- -- -- |
| 61.2. | Table Installment of UKT in Wijaya Kusuma University Surabaya | | For S1 graduate proceed to MastersProgram (S-2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 | 1.440.000 1.440.000 1.440.000 1.440.000 1.440.000 -- | 1.800.000 1.800.000 1.800.000 1.800.000 -- -- | 2.400.000 2.400.000 2.400.000 -- -- -- | 7.200.000 -- -- -- -- -- |
Table Installment Contribution of Education each semester (SPP) Shift Class (Blended) | 1. | Universitas Buddhi Dharma - Buddhi Dharma University | | 1.1. | UKT Table Installment at Buddhi Dharma University | | For Bachelor's Degree or equivalent graduates to continue to the Master's Program (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.530.000 1.530.000 1.530.000 1.530.000 1.530.000 | 1.830.000 1.830.000 1.830.000 1.830.000 1.830.000 -- | 2.300.000 2.300.000 2.300.000 2.250.000 -- -- | 3.050.000 3.050.000 3.050.000 -- -- -- | 9.150.000 -- -- -- -- -- |
| 2. | FKM UMJ - Faculty of Public Health University of Muhammadiyah Jakarta | | 2.1. | Table Installment of UKT at Faculty of Public Health University of Muhammadiyah Jakarta | | For graduate SMA/SMK, D3, Polytechnic, Academy proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.570.000 1.570.000 1.570.000 1.570.000 1.570.000 | 1.770.000 1.770.000 1.770.000 1.770.000 1.770.000 -- | 2.250.000 -- 2.550.000 -- 2.550.000 1.800.000 | 2.950.000 -- 2.950.000 -- 2.950.000 -- | 8.850.000 -- -- -- -- -- |
| 2.2. | Table Installment of UKT at Faculty of Public Health University of Muhammadiyah Jakarta | | For S1 proceed ke Master of Public Health (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 | 1.850.000 1.850.000 1.850.000 1.850.000 1.850.000 -- | 2.350.000 -- 2.350.000 -- 2.350.000 2.200.000 | 3.100.000 -- 3.100.000 -- 3.050.000 -- | 9.250.000 -- -- -- -- -- |
| 2.3. | Table Installment of UKT at Faculty of Public Health University of Muhammadiyah Jakarta | | For S1 proceed ke Master of Administration of Hospital (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 | 1.300.000 1.300.000 1.300.000 1.300.000 1.300.000 -- | 1.625.000 -- 1.625.000 -- 1.625.000 1.625.000 | 2.200.000 -- 2.200.000 -- 2.100.000 -- | 6.500.000 -- -- -- -- -- |
| 3. | Fakultas Teknik UMJ - Faculty of Engineering University of Muhammadiyah Jakarta | | 3.1. | UKT Installment Table at the UMJ Faculty of Engineering | | For Bachelor's degree, proceed to Masters in Chemical Engineering (S2) - RPL Programs |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 | 1.752.000 1.752.000 1.752.000 1.752.000 1.752.000 -- | 2.190.000 2.190.000 2.190.000 2.190.000 -- -- | 2.920.000 2.920.000 2.920.000 -- -- -- | 8.760.000 -- -- -- -- -- |
| 4. | STIE Hidayatullah Depok - Hidayatullah College of Economics Depok | | 4.1. | Table Installment of SPP in STIE Hidayatullah Employee Lecture and Online Program | | For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 400.000 400.000 400.000 400.000 400.000 400.000 | 480.000 480.000 480.000 480.000 480.000 -- | 600.000 600.000 600.000 600.000 -- -- | 800.000 800.000 800.000 -- -- -- | 2.400.000 -- -- -- -- -- |
| 5. | UIN Al-Azhaar Lubuklinggau - Al-Azhaar Nusantara Islamic University, Lubuklinggau | | 5.1. | Table Installment of UKT di Al-Azhaar Institute of Islamic Religion Lubuklinggau | | For S1 graduates, the equivalent continues to Postgraduate (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 925.000 915.000 915.000 915.000 915.000 915.000 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 -- | 1.375.000 1.375.000 1.375.000 1.375.000 -- -- | 1.834.000 1.833.000 1.833.000 -- -- -- | 5.500.000 -- -- -- -- -- |
| 6. | IMA - Institut Miftahul Huda Al-Azhar | | 6.1. | Table Installment of SPP in ISIF Cirebon | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program - Department of Islamic Religious Education |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 350.000 350.000 350.000 350.000 350.000 | 410.000 410.000 410.000 410.000 410.000 -- | 515.000 515.000 515.000 505.000 -- -- | 685.000 685.000 680.000 -- -- -- | 2.050.000 -- -- -- -- -- |
| 7. | STIE Indocakti Malang - Indocakti Malang College of Economics | | 7.1. | Installment Table at STIE Indocakti Malang | | For High School/Vocational School, Associate Degree (D3), etc. Graduates Continuing to the Undergraduate Program (S1) - Wave II |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 500 000 500 000 500 000 500 000 500 000 500 000 | 2 795 000 -- -- -- -- -- |
| 8. | ISTA Jakarta - Institute of Science and Technology Al Kamal Jakarta | | 8.1. | ISTA SPP Installment Table – Pharmacy | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 | 1.440.000 1.440.000 1.440.000 1.440.000 1.440.000 -- | 1.800.000 1.800.000 1.800.000 1.800.000 -- -- | 2.400.000 2.400.000 2.400.000 -- -- -- | 7.200.000 -- -- -- -- -- |
| 9. | Universitas IVET Semarang - Ivet University Semarang | | 9.1. | Top Fee Installment Table at Ivet University - Department of Civics Education, History, Economics, Geography, Science, Mathematics | | For high school/vocational school graduates, equivalent, to continue to the undergraduate program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 420.000 420.000 420.000 420.000 420.000 | 520.000 520.000 520.000 520.000 520.000 -- | 650.000 650.000 650.000 650.000 650 -- | 1.062.000 1.062.000 476.000 -- -- -- | 2.600.000 -- -- -- -- -- |
| 9.2. | SPP Installment Table at Ivet University - Department of Guidance Counseling, Environmental Sciences | | For high school/vocational school graduates, equivalent to continue to undergraduate programs |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600.000 647.000 647.000 647.000 647.000 647.000 | 767.000 767.000 767.000 767.000 767.000 -- | 959.000 959.000 959.000 959.000 -- -- | 1.517.000 1.517.000 816.000 -- -- -- | 3.835.000 -- -- -- -- -- |
| 9.3. | Tuition Installment Table at Ivet University - Islamic Religious Education, PGMI | | For high school/vocational school graduates, equivalent to continue to the S1 program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 420.000 420.000 420.000 420.000 420.000 | 520.000 520.000 520.000 520.000 520.000 -- | 520.000 520.000 520.000 520.000 -- -- | 1.062.000 1.062.000 476.000 -- -- -- | 2.600.000 -- -- -- -- -- |
| 9.4. | Tuition Installment Table at Ivet University - Informatics Education, Health Administration, Safety Engineering, Nutrition, Information Technology | | For high school/vocational school graduates, equivalent to continue to the S1 program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 700.000 770.000 770.000 770.000 770.000 770.000 | 910.000 910.000 910.000 910.000 910.000 -- | 1.138.000 1.138.000 1.138.000 1.138.000 -- -- | 1.279.000 1.279.000 1.992.000 -- -- -- | 4.550.000 -- -- -- -- -- |
| 9.5. | Tuition Installment Table at Ivet University - Digital Business Department | | For high school/vocational school graduates, equivalent to continue to the S1 program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 900.000 808.000 808.000 808.000 808.000 808.000 | 988.000 988.000 988.000 988.000 988.000 -- | 1.235.000 1.235.000 1.235.000 1.235.000 -- -- | 1.800.000 1.800.000 1.340.000 -- -- -- | 4.940.000 -- -- -- -- -- |
| 9.6. | Tuition Installment Table at Ivet University - Department of Ship Engineering, Ship Building Engineering, Ship Electrical Engineering | | For high school/vocational school graduates, equivalent to continue to the D3 program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 700.000 770.000 770.000 770.000 770.000 770.000 | 910.000 910.000 910.000 910.000 910.000 -- | 1.138.000 1.138.000 1.138.000 1.138.000 -- -- | 1.517.000 1.517.000 1.516.000 -- -- -- | 4.550.000 -- -- -- -- -- |
| 10. | Universitas Kahuripan Kediri - University of Kahuripan Kediri | | 10.1. | Table Installment of SPP in KAHURIPAN - Department of Agribusiness, Agrotechnology, PJKR, PPKN, livestock, Electrical Engineering, Informatics Engineering, Civil Engineering, Management | | For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 550.000 610.000 610.000 610.000 610.000 610.000 | 720.000 720.000 720.000 720.000 720.000 -- | 900.000 900.000 900.000 900.000 -- -- | 1.200.000 1.200.000 1.200.000 -- -- -- | 3.600.000 -- -- -- -- -- |
| 10.2. | Table Installment of SPP in KAHURIPAN - Department of Accounting | | For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 750.000 850.000 850.000 850.000 850.000 850.000 | 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 -- | 1.250.000 1.250.000 1.250.000 1.250.000 -- -- | 1.660.000 1.660.000 1.680.000 -- -- -- | 5.000.000 -- -- -- -- -- |
| 11. | MH UNKRIS Jakarta - Master of Law Krisnadwipayana University Jakarta | | 11.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 12. | MIA UNKRIS Jakarta - Master of Administrative Science Krisnadwipayana University Jakarta | | 12.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 13. | MM Patria Artha Makassar - Master of Management Patria Artha University Makassar | | 13.1. | Table Installment of SPP in Patria Artha University | | For graduate S1 proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 800.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 | 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 -- | 1.450.000 1.450.000 1.450.000 1.450.000 -- -- | 1.950.000 1.950.000 1.900.000 -- -- -- | 5.800.000 -- -- -- -- -- |
| 14. | MM STIE ABI Surabaya - Master of Manajemen STIE Artha Bodhi Surabaya | | 14.1. | Installment table at STIE Artha Bodhi Iswara | | For graduate S1 equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.070.000 1.070.000 1.070.000 1.070.000 1.070.000 | 950.000 950.000 950.000 950.000 950.000 -- | 4.750.000 -- -- -- -- -- |
| 15. | MM STIE GICI Business School - Master of Management STIE GICI | | 15.1. | Table Installment of SPP in STIE GICI - Master of Management | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 700.000 700.000 700.000 700.000 700.000 | 780.000 780.000 780.000 780.000 780.000 -- | 975.000 975.000 975.000 975.000 -- -- | 1.300.000 1.300.000 1.300.000 -- -- -- | 3.900.000 -- -- -- -- -- |
| 16. | MM UMIBA Jakarta - Master of Management, Mitra Bangsa University, Jakarta | | 16.1. | Table Installment of UKT in MM UMIBA | | For graduate S1 or equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 | 1.320.000 1.320.000 1.320.000 1.320.000 1.320.000 -- | 1.650.000 1.650.000 1.650.000 1.650.000 -- -- | 2.200.000 2.200.000 2.200.000 -- -- -- | 6.600.000 -- -- -- -- -- |
| 17. | MM UNKRIS Jakarta - Master of Management Krisnadwipayana University Jakarta | | 17.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 18. | S2 UIN Al-Azhaar Lubuklinggau - Master of Nusantara Islamic University Al-Azhaar Lubuklinggau | | 18.1. | Table Installment of UKT di Al-Azhaar Institute of Islamic Religion Lubuklinggau | | For S1 graduates, the equivalent continues to Postgraduate (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 925.000 915.000 915.000 915.000 915.000 915.000 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 -- | 1.375.000 1.375.000 1.375.000 1.375.000 -- -- | 1.834.000 1.833.000 1.833.000 -- -- -- | 5.500.000 -- -- -- -- -- |
| 19. | MPD UM SURABAYA - Master of Education University of Muhammadiyah Surabaya | | 19.1. | Table of Online Lecture Program Installments (P2O) in UMS - Indonesian Language and Literature Education (S2) | | For S1 graduates, the equivalent continues to Postgraduate Masters |
| Months | The number and amount of installments | | 24 x | 18 x | 12 x | 4x | 1 x | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19-23 24 | 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.074.000 1.058.000 | 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.432.000 1.416.000 -- -- | 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.147.000 2.143.000 -- -- -- -- -- -- -- -- | 6.440.000 6.440.000 6.440.000 6.440.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- | 25.760.000 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- |
| 20. | Universitas Mpu Tantular Jakar - University of Mpu Tantular Jakarta | | 20.1. | Table of Basic Fee Installments Per Semester for 5 Semesters (only in semesters I to V) | | For high school, vocational & D3 graduates, equivalent to continue to S1 |
| Months | The number and amount of installments | | 2x | 1x | 1 2 3 4 5 6 | -- -- 100 000 -- 100 000 -- | 200 000 -- -- -- -- -- |
| 21. | Mpu Tantular Kedoya Jakarta - Mpu Tantular Jakarta Kedoya | | 21.1. | Table of Basic Fee Installments Per Semester for 5 Semesters (only in semesters I to V) | | For high school, vocational & D3 graduates, equivalent to continue to S1 |
| Months | The number and amount of installments | | 2x | 1x | 1 2 3 4 5 6 | -- -- 100 000 -- 100 000 -- | 200 000 -- -- -- -- -- |
| 22. | S2 FT UMJ - Magister Teknik Kimia Fakultas Teknik UMJ | | 22.1. | UKT Installment Table at the UMJ Faculty of Engineering | | For Bachelor Degree or equivalent graduates, proceed to Masters in Chemical Engineering (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 | 1.752.000 1.752.000 1.752.000 1.752.000 1.752.000 -- | 2.190.000 2.190.000 2.190.000 2.190.000 -- -- | 2.920.000 2.920.000 2.920.000 -- -- -- | 8.760.000 -- -- -- -- -- |
| 23. | MT UNKRIS Jakarta - Master of Engineering Krisnadwipayana University Jakarta | | 23.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 24. | UNAS PASIM - Pasim National University Bandung | | 24.1. | Table Installment of UKT in UNKRIS | | For graduate SMA / SMK, D3, equivalent proceed to D3 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 2x | 1 x | 1 2 3 4 5 6 | 555.000 573.000 573.000 573.000 573.000 573.000 | 684.000 684.000 684.000 684.000 684.000 -- | 855.000 855.000 855.000 855.000 -- -- | 1.140.000 1.140.000 1.140.000 -- -- -- | 1.710.000 1.710.000 -- -- -- -- | 3.420.000 -- -- -- -- -- |
| 25. | Universitas Patria Artha Makas - Patria Artha University Makassar | | 25.1. | Table Installment of SPP in Patria Artha University | | For graduate SMA/SMK, D1, D2, etc. proceed to D3 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 690.000 690.000 690.000 690.000 690.000 | 770.000 770.000 770.000 770.000 770.000 -- | 1.000.000 950.000 950.000 950.000 -- -- | 1.350.000 1.250.000 1.250.000 -- -- -- | 3.850.000 -- -- -- -- -- |
| 25.2. | Table Installment of SPP in Patria Artha University | | For graduate SMA/SMK, D3, equivalent proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 690.000 690.000 690.000 690.000 690.000 | 770.000 770.000 770.000 770.000 770.000 -- | 1.000.000 950.000 950.000 950.000 -- -- | 1.350.000 1.250.000 1.250.000 -- -- -- | 3.850.000 -- -- -- -- -- |
| 25.3. | Table Installment of SPP in Patria Artha University | | For graduate S1 proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 800.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 | 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 -- | 1.450.000 1.450.000 1.450.000 1.450.000 -- -- | 1.950.000 1.950.000 1.900.000 -- -- -- | 5.800.000 -- -- -- -- -- |
| 26. | Polnas Denpasar - National Polytechnic Denpasar Bali | | 26.1. | Table Installment of SPP P2K Programs in Polnas Denpasar Bali | | For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to D-3 P2K Programs |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 750.000 750.000 750.000 750.000 750.000 750.000 | 900.000 900.000 900.000 900.000 900.000 -- | 1.125.000 1.125.000 1.125.000 1.125.000 -- -- | 1.500.000 1.500.000 1.500.000 -- -- -- | 4.500.000 -- -- -- -- -- |
| 27. | Magister Universitas Buddhi Dh - Magister Universitas Buddhi Dharma | | 27.1. | UKT Table Installment at Buddhi Dharma University | | For Bachelor's Degree or equivalent graduates to continue to the Master's Program (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.530.000 1.530.000 1.530.000 1.530.000 1.530.000 | 1.830.000 1.830.000 1.830.000 1.830.000 1.830.000 -- | 2.300.000 2.300.000 2.300.000 2.250.000 -- -- | 3.050.000 3.050.000 3.050.000 -- -- -- | 9.150.000 -- -- -- -- -- |
| 28. | Magister Universitas Satyagama - Magister Universitas Satyagama Jakarta | | 28.1. | Table Installment of UKT at Satyagama University | | For Bachelor (S1) graduates to continue to the Master's Program (S2) - Semester IV etc. |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 625.000 625.000 625.000 625.000 625.000 625.000 | 750.000 750.000 750.000 750.000 750.000 -- | 938.000 938.000 938.000 936.000 -- -- | 1.250.000 1.250.000 1.250.000 -- -- -- | 3.750.000 -- -- -- -- -- |
| 29. | S2 UNKRIS Jakarta - Krisnadwipayana Jakarta University Masters | | 29.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 30. | S2 UNSURYA - Master of Aerospace University Marshal Suryadarma | | 30.1. | Table Installment of SPP in University of Dirgantara Marsekal Suryadarma - Magister of Management, Master of Laws | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 825.000 825.000 825.000 825.000 825.000 825.000 | 990.000 990.000 990.000 990.000 990.000 -- | 1.240.000 1.240.000 1.240.000 1.250.000 -- -- | 1.650.000 1.650.000 1.650.000 -- -- -- | 4.950.000 -- -- -- -- -- | ) |
| 31. | Universitas Satyagama - Satyagama University | | 31.1. | Table Installment of UKT at Satyagama University | | For Bachelor (S2) graduates proceed to the Doctoral (S3) Program Semester IV |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.600.000 1.600.000 1.600.000 1.600.000 1.600.000 | 2.000.000 2.000.000 2.000.000 2.000.000 2.000.000 -- | 2.500.000 2.500.000 2.500.000 2.500.000 -- -- | 4.000.000 4.000.000 2.000.000 -- -- -- | 10.000.000 -- -- -- -- -- |
| 32. | STAN-IM - Sekolah Tinggi Ilmu Ekonomi STAN Indonesia Mandiri | | 32.1. | Table of tuition installments at STAN-IM for majors in Accounting, Management. | | For graduates of SMA, SMK, D3, Polytechnic, etc., proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 32.2. | Table of tuition installments at STAN-IM for majors in Accounting, Management. | | For graduates of SMA, SMK, D3, Polytechnic, etc., proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 33. | STBA Lia Yogyakarta - Lia Yogyakarta Foreign Language College | | 33.1. | Table Installment of UKT in STBA LIA YOGYAKARTA | | For graduate SMA/SMK, D3, etc. proceed to Diploma Program (D3) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 650.000 610.000 610.000 610.000 610.000 610.000 | 740.000 740.000 740.000 740.000 740.000 -- | 925.000 925.000 925.000 925.000 -- -- | 1.250.000 1.250.000 1.200.000 -- -- -- | 3.700.000 -- -- -- -- -- |
| 34. | STIE GICI Business School Dep - STIE GICI Business School | | 34.1. | Table Installment of SPP in STIE GICI - Jatiwaringin Jakarta | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 34.2. | Table Installment of SPP in STIE GICI Jatiwaringin Jakarta - Online Class | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 34.3. | Table Installment of SPP in STIE GICI - Bekasi | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 550.000 650.000 650.000 650.000 650.000 650.000 | 760.000 760.000 760.000 760.000 760.000 -- | 950.000 950.000 950.000 950.000 -- -- | 1.267.000 1.267.000 1.266.000 -- -- -- | 3.800.000 -- -- -- -- -- |
| 34.4. | Table Installment of SPP in STIE GICI - Bekasi Online Class | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 34.5. | Table Installment of SPP in STIE GICI Depok - Employee class | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 525.000 525.000 525.000 525.000 525.000 525.000 | 3.150.000 -- -- -- -- -- |
| 34.6. | Table Installment of SPP in STIE GICI Depok - Online Class | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 525.000 525.000 525.000 525.000 525.000 525.000 | 3.150.000 -- -- -- -- -- |
| 34.7. | Table Installment of SPP in STIE GICI - Master of Management - (P2K) and (P2O) | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 975.000 975.000 975.000 975.000 975.000 975.000 | 1.170.000 1.170.000 1.170.000 1.170.000 1.170.000 -- | 1.460.000 1.460.000 1.460.000 1.470.000 -- -- | 1.950.000 1.950.000 1.950.000 -- -- -- | 5.850.000 -- -- -- -- -- |
| 35. | STIE ABI Surabaya - Artha Bodhi Iswara College of Economic Surabaya | | 35.1. | Installment table at STIE Artha Bodhi Iswara | | For graduate S1 equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.070.000 1.070.000 1.070.000 1.070.000 1.070.000 | 950.000 950.000 950.000 950.000 950.000 -- | 4.750.000 -- -- -- -- -- |
| 36. | STIE PASIM Sukabumi - Pasim College of Economics Sukabumi | | 36.1. | Table Installment UKT in STIE PASIM | | For graduate SMA/SMK,D3, etc. proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 2 x | 1 x | 1 2 3 4 5 6 | 650.000 650.000 650.000 650.000 650.000 600.000 | 770.000 770.000 770.000 770.000 770.000 -- | 1.000.000 1.000.000 1.000.000 850.000 -- -- | 1.300.000 1.300.000 1.250.000 -- -- -- | 1.925.000 1.925.000 -- -- -- -- | 3.850.000 -- -- -- -- -- |
| 37. | STIESIA Surabaya - Indonesian College of Economics Surabaya | | 37.1. | UKT Installment Table at STIESIA Surabaya | | For High School/Vocational School Graduates Continuing to Diploma Program (D3) |
| Months | The number and amount of installments | | 6 times | 5 times | 4 times | 3 times | 1 time | 1 2 3 4 5 6 | 800 000 800 000 800 000 800 000 800 000 800 000 | 4 800 000 -- -- -- -- -- | ) | | |
| 38. | STIE Widya Darma Surabaya - College of Economic Widya Darma Surabaya | | 38.1. | Table Installment of SPP in STIE Widya Darma Surabaya | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 200.000 360.000 360.000 360.000 360.000 360.000 | 400.000 400.000 400.000 400.000 400.000 -- | 500.000 500.000 500.000 500.000 -- -- | 667.000 667.000 666.000 -- -- -- | 2.000.000 -- -- -- -- -- |
| 39. | UBHINUS - University Of Bhinneka Nusantara | | 39.1. | Table Installment of SPP in STIKI Malang | | For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 -- | 1.500.000 1.500.000 1.500.000 1.500.000 -- -- | 2.000.000 2.000.000 2.000.000 -- -- -- | 6.000.000 -- -- -- -- -- |
| 39.2. | Table Installment of SPP in STIKI Malang | | For graduate SMU, SMK, D3, equivalent proceed to D-3 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 500.000 500.000 500.000 500.000 500.000 | 600.000 600.000 600.000 600.000 600.000 -- | 750.000 750.000 750.000 750.000 -- -- | 1.000.000 1.000.000 1.000.000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 40. | Universitas Mitra Bangsa - Mitra Bangsa University, Jakarta | | 40.1. | Table Installment of UKT in MM Universitas Mitra Bangsa Jakarta | | For graduate S1 or equivalent proceed to S2 Programs (MM) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 1.100.000 | 1.320.000 1.320.000 1.320.000 1.320.000 1.320.000 -- | 1.650.000 1.650.000 1.650.000 1.650.000 -- -- | 2.200.000 2.200.000 2.200.000 -- -- -- | 6.600.000 -- -- -- -- -- |
| 41. | STT Bina Tunggal Bekasi - Bina Tunggal Bekasi College of Technology | | 41.1. | Table Installment of UKTSTT Bina Tunggal - P2K | | For graduate SMA/SMK, proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 875.000 875.000 875.000 875.000 875.000 875.000 | 1.050.000 1.050.000 1.050.000 1.050.000 1.050.000 -- | 1.350.000 1.350.000 1.350.000 1.200.000 -- -- | 1.750.000 1.750.000 1.750.000 -- -- -- | 5.250.000 -- -- -- -- -- |
| 41.2. | Table Installment of UKT STT Bina Tunggal - P2K c | | For graduate D3, . proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 800.000 765.000 765.000 765.000 765.000 765.000 | 925.000 925.000 925.000 925.000 925.000 -- | 1.200.000 1.200.000 1.200.000 1.025.000 -- -- | 1.542.000 1.542.000 1.541.000 -- -- -- | 4.625.000 -- -- -- -- -- |
| 41.3. | Tabel Angsuran UKT di STT Bina Tunggal - P2K Kelas Sore/Malam dan P2K Akhir Pekan | | Untuk Lulusan SMA/SMK/sederajat melanjutkan ke Program D3 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 750.000 750.000 750.000 750.000 750.000 750.000 | 900.000 900.000 900.000 900.000 900.000 -- | 1.125.000 1.125125.000 1.125.000 1.125.000 -- -- | 1.500.000 1.500.000 1.500.000 -- -- -- | 4.500.000 -- -- -- -- -- |
| 42. | Universitas Tanri Abeng Jakart - TANRI ABENG UNIVERSITY Jakarta | | 42.1. | Tuition Fee per Year of SPP in TANRI ABENG UNIVERSITY - Department Of Management & Communication Studies | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 | 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 | 1.250.000 1.250.000 1.250.000 1.250.000 -- | 2.000.000 2.000.000 1.000.000 -- -- | 5.000.000 -- -- -- -- |
| 42.2. | Tuition Fee per Tahun di TANRI ABENG UNIVERSITY Department of Accounting, Business Administration & Architecture | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 | 800.000 800.000 800.000 800.000 800.000 | 1.000.000 1.000.000 1.000.000 1.000.000 -- | 1.350.000 1.350.000 1.350.000 -- -- | 4.000.000 -- -- -- -- |
| 43. | UAI - Universitas Al-Azhar Indonesia | | 43.1. | UAI Tuition Fee Installment Table – Electrical Engineering & International Relations | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.150.000 1.150.000 1.150.000 1.150.000 1.150.000 1.150.000 | 1.360.000 1.360.000 1.360.000 1.360.000 1.360.000 -- | 1.700.000 1.700.000 1.700.000 1.700.000 -- -- | 2.300.000 2.300.000 2.200.000 -- -- -- | 6.800.000 -- -- -- -- -- |
| 43.2. | UAI Tuition Fee Installment Table – Food Technology & Law | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.300.000 1.300.000 1.300.000 1.300.000 1.300.000 1.300.000 | 1.560.000 1.560.000 1.560.000 1.560.000 1.560.000 -- | 1.950.000 1.950.000 1.950.000 1.950.000 -- -- | 2.600.000 2.600.000 2.600.000 -- -- -- | 7.800.000 -- -- -- -- -- |
| 43.3. | UAI Tuition Fee Installment Table – Food Technology & Law | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.300.000 1.300.000 1.300.000 1.300.000 1.300.000 1.300.000 | 1.560.000 1.560.000 1.560.000 1.560.000 1.560.000 -- | 1.950.000 1.950.000 1.950.000 1.950.000 -- -- | 2.600.000 2.600.000 2.600.000 -- -- -- | 7.800.000 -- -- -- -- -- |
| 44. | Universitas Ubudiyah Indonesia - University of Ubudiyah Indonesia Aceh | | 44.1. | Installment Table of SPP at Ubudiyah Indonesia University - PGSD Department, Pend. Computer Science | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 460.000 460.000 460.000 460.000 460.000 | 520.000 520.000 520.000 520.000 520.000 -- | 650.000 650.000 650.000 650.000 -- -- | 870.000 870.000 860.000 -- -- -- | 2.600.000 -- -- -- -- -- |
| 44.2. | Installment Table of SPP at Ubudiyah University Indonesia - Department of Law | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 700.000 700.000 700.000 700.000 700.000 | 780.000 780.000 780.000 780.000 780.000 -- | 975.000 975.000 975.000 975.000 -- -- | 1.300.000 1.300.000 1.300.000 -- -- -- | 3.900.000 -- -- -- -- -- |
| 44.3. | Installment table for SPP at Ubudiyah Indonesia University - Midwifery Department (D3) | | For high school / vocational school graduates, etc., proceed to the D3 program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 700.000 700.000 700.000 700.000 700.000 | 780.000 780.000 780.000 780.000 780.000 -- | 975.000 975.000 975.000 975.000 -- -- | 1.300.000 1.300.000 1.300.000 -- -- -- | 3.900.000 -- -- -- -- -- |
| 44.4. | Installment Table of SPP at Ubudiyah University Indonesia - Midwifery Department (D4) | | For SMA / SMK, D3, etc. graduates, proceed to Program D4 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 1.142.000 1.142.000 1.142.000 1.142.000 1.142.000 | 1.222.000 1.222.000 1.222.000 1.222.000 1.222.000 -- | 1.530.000 1.530.000 1.530.000 1.520.000 -- -- | 2.040.000 2.040.000 2.030.000 -- -- -- | 6.110.000 -- -- -- -- -- |
| 44.5. | Installment Table of SPP at Ubudiyah University Indonesia - Department of Pharmacy (S1) | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 1.830.000 1.830.000 1.830.000 1.830.000 1.813.000 | 1.930.000 1.930.000 1.930.000 1.930.000 1.913.000 -- | 2.410.000 2.410.000 2.410.000 2.403.000 -- -- | 3.211.000 3.211.000 3.211.000 -- -- -- | 9.633.000 -- -- -- -- -- |
| 44.6. | Installment Table of SPP at Ubudiyah University Indonesia - Department of Nutrition (S1) | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 902.000 902.000 902.000 902.000 902.000 | 962.000 962.000 962.000 962.000 962.000 -- | 1.205.000 1205.000 1.205.000 1.195.000 -- -- | 1.800.000 1.800.000 1.210.000 -- -- -- | 4.810.000 -- -- -- -- -- |
| 44.7. | Installment table for SPP at Ubudiyah University Indonesia - Department of Psychology (S1) | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 200.000 532.000 532.000 532.000 532.000 532.000 | 572.000 572.000 572.000 572.000 572.000 -- | 715.000 715.000 715.000 715.000 -- -- | 955.000 955.000 950.000 -- -- -- | 2.860.000 -- -- -- -- -- |
| 44.8. | Installment Table of SPP at Ubudiyah University Indonesia - Department of Public Health, Management, Accounting (S1) | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 590.000 590.000 590.000 590.000 590.000 | 650.000 650.000 650.000 650.000 650.000 -- | 820.000 820.000 820.000 790.000 -- -- | 1.090.000 1.090.000 1.070.000 -- -- -- | 3.250.000 -- -- -- -- -- |
| 44.9. | Installment Table of SPP at Ubudiyah University Indonesia - Informatics Engineering Department, Information System (S1) | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 772.000 772.000 772.000 772.000 772.000 | 832.000 832.000 832.000 832.000 832.000 -- | 1.040.000 1.040.000 1.040.000 1.040.000 -- -- | 1.390.000 1.390.000 1.380.000 -- -- -- | 4.160.000 -- -- -- -- -- |
| 44.10. | Installment Table of SPP at Ubudiyah University Indonesia - Department of Information Management, Computerized Accounting (D3) | | For high school / vocational school graduates, etc., proceed to the D3 program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 590.000 590.000 590.000 590.000 590.000 | 650.000 650.000 650.000 650.000 650.000 -- | 820.000 820.000 820.000 790.000 -- -- | 1.090.000 1.090.000 1.070.000 -- -- -- | 3.250.000 -- -- -- -- -- |
| 44.11. | Installment Table of SPP at Ubudiyah University Indonesia - Department of Civil Engineering, Architecture (S1) | | For SMA / SMK, D3, etc. graduates, proceed to the S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300.000 850.000 850.000 850.000 850.000 850.000 | 910.000 910.000 910.000 910.000 910.000 -- | 1.140.000 1.140.000 1.140.000 1.130.000 -- -- | 1.520.000 1.520.000 1.510.000 -- -- -- | 4.550.000 -- -- -- -- -- |
| 45. | UHAMZAH Medan - University of Amir Hamzah Medan | | 45.1. | Table Installment SPP in UHAMZAH - University of Amir Hamzah | | For graduate SMA/SMK,D3, etc. proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 300.000 690.000 690.000 690.000 690.000 690.000 | 750.000 750.000 750.000 750.000 750.000 -- | 938.000 938.000 938.000 936.000 -- -- | 1.250.000 1.250.000 1.250.000 -- -- -- | 3.750.000 -- -- -- -- -- |
| 46. | UICI - Insan Cita Indonesia University | | 46.1. | Installment Table for UKT at Insan Cita Indonesia University - Psychology Major | | For High School/Vocational, Diploma, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 400.000 320.000 320.000 320.000 320.000 320.000 | 400.000 400.000 400.000 400.000 400.000 -- | 500.000 500.000 500.000 500.000 -- -- | 670.000 670.000 660.000 -- -- -- | 2.000.000 -- -- -- -- -- |
| 46.2. | Installment Table for UKT at Insan Cita Indonesia University - Non Psychology Major | | For High School/Vocational, Diploma, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 400.000 400.000 400.000 400.000 400.000 | 500.000 500.000 500.000 500.000 500.000 -- | 625.000 625.000 625.000 625.000 -- -- | 850.000 850.000 800.000 -- -- -- | 2.500.000 -- -- -- -- -- |
| 47. | UM Palangkaraya - Muhammadiyah University of Palangkaraya | | 47.1. | Table Installment SPP in University of Muhammadiyah Palangkaraya | | For graduate SMA/SMK, D1, D2, D3, etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 750.000 760.000 760.000 760.000 760.000 760.000 | 910.000 910.000 910.000 910.000 910.000 -- | 1.130.000 1.140.000 1.140.000 1.140.000 -- -- | 1.520.000 1.515.000 1.515.000 -- -- -- | 4.550.000 -- -- -- -- -- |
| 48. | Universitas Muhammadiyah Jakar - University of Muhammadiyah Jakarta | | 48.1. | Table Installment SPP in UMJ - AGRICULTURAL FACULTY | | For graduate SMA/SMK, D1, D2, D3, etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 800.000 978.000 978.000 978.000 978.000 978.000 | 1.138.000 1.138.000 1.138.000 1.138.000 1.138.000 -- | 1.423.000 1.423.000 1.423.000 1.421.000 -- -- | 1.897.000 1.897.000 1.896.000 -- -- -- | 5.690.000 -- -- -- -- -- |
| 48.2. | Table Installment SPP in FISIP - UMJ Department of Social Welfare | | For graduate SMA/SMK proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.300.000 1.640.000 1.640.000 1.640.000 1.640.000 1.640.000 | 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 -- | 2.375.000 2.375.000 2.375.000 2.375.000 -- -- | 3.170.000 3.170.000 3.160.000 -- -- -- | 9.500.000 -- -- -- -- -- |
| 48.3. | Table Installment SPP in FISIP - UMJ Department of Adm. Public and Political Science | | For graduate SMA/SMK proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.300.000 1.490.000 1.490.000 1.490.000 1.490.000 1.490.000 | 1.750.000 1.750.000 1.750.000 1.750.000 1.750.000 -- | 2.200.000 2.200.000 2.200.000 2.150.000 -- -- | 2.950.000 2.950.000 2.850.000 -- -- -- | 8.750.000 -- -- -- -- -- |
| 48.4. | Table Installment SPP in FISIP UMJ - Communication Studies | | For graduate SMA/SMK proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.750.000 2.200.000 2.200.000 2.200.000 2.200.000 2.200.000 | 2.550.000 2.550.000 2.550.000 2.550.000 2.550.000 -- | 3.200.000 3.200.000 3.200.000 3.150.000 -- -- | 4.250.000 4.250.000 4.250.000 -- -- -- | 12.750.000 -- -- -- -- -- |
| 48.5. | Table Installment SPP in FISIP UMJ - Master of Science communication | | For graduate S1 equivalent proceed to S-2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.600.000 1.600.000 1.600.000 1.600.000 1.600.000 | 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 -- | 2.375.000 2.375.000 2.375.000 2.375.000 -- -- | 3.166.000 3.166.000 3.168.000 -- -- -- | 9.500.000 -- -- -- -- -- |
| 48.6. | Table Installment SPP in FISIP UMJ - Master of Administrative Sciences and Masters in Political Science | | For graduate S1 equivalent proceed to S-2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.350.000 1.430.000 1.430.000 1.430.000 1.430.000 1.430.000 | 1.700.000 1.700.000 1.700.000 1.700.000 1.700.000 -- | 2.125.000 2.125.000 2.125.000 2.125.000 -- -- | 2.835.000 2.835.000 2.830.000 -- -- -- | 8.500.000 -- -- -- -- -- |
| 48.7. | UKT Installment Table at the UMJ Faculty of Engineering | | For high school, vocational school, D3 or equivalent graduates, proceed to Bachelor (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 990.000 990.000 990.000 990.000 990.000 990.000 | 1.188.000 1.188.000 1.188.000 1.188.000 1.188.000 -- | 1.485.000 1.485.000 1.485.000 1.485.000 -- -- | 1.980.000 1.860.000 1.860.000 -- -- -- | 5.940.000 -- -- -- -- -- |
| 48.8. | UKT Installment Table at the UMJ Faculty of Engineering | | For high school, vocational school, D3 or equivalent graduates, proceed to Masters in Chemical Engineering (S2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 1.460.000 | 1.752.000 1.752.000 1.752.000 1.752.000 1.752.000 -- | 2.190.000 2.190.000 2.190.000 2.190.000 -- -- | 2.920.000 2.920.000 2.920.000 -- -- -- | 8.760.000 -- -- -- -- -- |
| 49. | Universitas Mochammad Sroedji - Universitas Mochammad Sroedji Jember | | 49.1. | Table Installment of SPP in University of Mochammad Sroedji Jember | | For graduate SMA/SMK/D3 etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 550.000 550.000 550.000 550.000 550.000 550.000 | 660.000 660.000 660.000 660.000 660.000 -- | 825.000 825.000 825.000 825.000 -- -- | 1.100.000 1.100.000 1.100.000 -- -- -- | 3.300.000 -- -- -- -- -- |
| 50. | UNAKI Semarang - University of AKI Semarang | | 50.1. | Table Installment of UKT in UNAKI Semarang | | For graduate D3 to S1 Program - Semester 1 until 8 |
| Months | The number and amount of installments | | 6 x | 1 x | 1 2 3 4 5 6 | 725.000 725.000 725.000 725.000 725.000 725.000 | 4.350.000 -- -- -- -- -- |
| 51. | UNAS - National Univeristy | | 51.1. | Installment Table for UKT at Universitas Nasional - Management Major | | For High School/Vocational, Diploma, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 2 000 000 1 915 000 1 915 000 1 915 000 1 915 000 1 915 000 | 2 315 000 2 315 000 2 315 000 2 315 000 2 315 000 -- | 2 900 000 2 900 000 2 875 000 -- -- -- | 3 860 000 3 860 000 3 855 000 -- -- -- | 11 575 000 -- -- -- -- -- |
| 52. | UNDARIS Ungaran Semarang - University of Islamic Centre Darul Ulum Sudirman GUPPI Ungaran Semaran | | 52.1. | Table of tuition installments at UNDARIS for majors in Law, Civil Engineering, Elementary School Teacher Education, Animal Husbandry, Management. | | For graduates of SMA, SMK, D3, Polytechnic, etc., proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 650 000 650 000 650 000 650 000 650 000 650 000 | 780 000 780 000 780 000 780 000 780 000 -- | 975 000 975 000 975 000 975 000 -- -- | 1 300 000 1 300 000 1 300 000 -- -- -- | 3 900 000 -- -- -- -- -- |
| 52.2. | Table of tuition installments at UNDARIS for PPKN majors. | | For graduates of SMA, SMK, D3, Polytechnic, etc., proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 550 000 550 000 550 000 550 000 550 000 550 000 | 660 000 660 000 660 000 660 000 660 000 -- | 825 000 825 000 825 000 825 000 -- -- | 1 100 000 1 100 000 1 100 000 -- -- -- | 3 300 000 -- -- -- -- -- |
| 52.3. | Table of tuition installments at UNDARIS for Islamic Religious Education majors. | | For graduates of SMA, SMK, D3, Polytechnic, etc., proceed to S-1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 520 000 520 000 520 000 520 000 520 000 520 000 | 624 000 624 000 624 000 624 000 624 000 -- | 780 000 780 000 780 000 780 000 -- -- | 1 040 000 1 040 000 1 040 000 -- -- -- | 3.120.000 -- -- -- -- -- |
| 53. | UNIBA Banyuwangi - Universitas PGRI Banyuwangi | | 53.1. | SPP Installment Table at PGRI Banyuwangi University | | For graduates of SMA/SMK, D3, etc., proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 610.000 610.000 610.000 610.000 610.000 610.000 | 732.000 732.000 732.000 732.000 732.000 -- | 915.000 915.000 915.000 915.000 -- -- | 1.220.000 1.220.000 1.220.000 -- -- -- | 3.660.000 -- -- -- -- -- |
| 53.2. | SPP Installment Table at PGRI Banyuwangi University - Department BK Education, English Education, PJKR & Machine Engineering | | For graduates of SMA/SMK, D3, etc., proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 740.000 740.000 740.000 740.000 740.000 740.000 | 888.000 888.000 888.000 888.000 888.000 -- | 1.110.000 1.110.000 1.110.000 1.110.000 -- -- | 1.480.000 1.480.000 1.480.000 -- -- -- | 4.440.000 -- -- -- -- -- |
| 53.3. | SPP Installment Table at PGRI Banyuwangi University - PPKN Education Department, History Education, BK Education, Biology Education, English Education, PJKR, Mathematics Education | | For graduates of SMA/SMK, D3, etc., proceed to the RPL S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 700.000 600.000 600.000 600.000 600.000 600.000 | 740.000 740.000 740.000 740.000 740.000 -- | 925.000 925.000 925.000 925.000 -- -- | 1.300.000 1.300.000 1.100.000 -- -- -- | 3.700.000 -- -- -- -- -- |
| 54. | Universitas Gresik - Gresik University | | 54.1. | Installment Table at Universitas Gresik | | For D3 Graduates to S1 in Computer Science |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 950.000 950.000 950.000 950.000 950.000 950.000 | 1.140.000 1.140.000 1.140.000 1.140.000 1.140.000 -- | 1.425.000 1.425.000 1.425.000 1.425.000 -- -- | 1.900.000 1.900.000 1.900.000 -- -- -- | 5.700.000 -- -- -- -- -- |
| 55. | UNISA Kuningan Jawa Barat - Islamic University of Al-Ihya Kuningan | | 55.1. | Table Installment of SPP in UNISA - FIK and FKIP | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600.000 608.000 608.000 608.000 608.000 608.000 | 728.000 728.000 728.000 728.000 728.000 -- | 910.000 910.000 910.000 910.000 -- -- | 1.215.000 1.215.000 1.210.000 -- -- -- | 3.640.000 -- -- -- -- -- |
| 55.2. | Table Installment of SPP in UNISA - Faculty of Engineering and Department of Public Health | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600.000 816.000 816.000 816.000 816.000 816.000 | 900.000 945.000 945.000 945.000 945.000 -- | 1.170.000 1.170.000 1.170.000 1.170.000 -- -- | 1.560.000 1.560.000 1.560.000 -- -- -- | 4.680.000 -- -- -- -- -- |
| 55.3. | Table Installment of SPP in UNISA - Department of Nutrition | | For graduate SMA / SMK, D3, equivalent proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600.000 868.000 868.000 868.000 868.000 868.000 | 900.000 1.010.000 1.010.000 1.010.000 1.010.000 -- | 1.235.000 1.235.000 1.235.000 1.235.000 -- -- | 1.650.000 1.645.000 1.645.000 -- -- -- | 4.940.000 -- -- -- -- -- |
| 55.4. | SPP Installment Table at UNISA - Faculty of Health, Department of Nutrition | | For SMA/SMK graduates, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 750 000 630 000 630 000 630 000 630 000 630 000 | 780 000 780 000 780 000 780 000 780 000 -- | 975 000 975 000 975 000 975 000 -- -- | 1 300 000 1 300 000 1 300 000 -- -- -- | 3 900 000 -- -- -- -- -- |
| 56. | Universitas LIA - University of LIA | | 56.1. | Tabel Angsuran UKT di Universitas Lia | | Untuk Lulusan SMA, SMK, D3, sederajat melanjutkan ke Sarjana (S1) majoring in English & Japanese |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 2.250.000 2.250.000 750.000 750.000 750.000 750.000 | 2.400.000 2.400.000 900.000 900.000 900.000 -- | 2.625.000 2.625.000 1.125.000 1.125.000 -- -- | 3.000.000 3.000.000 1.500.000 -- -- -- | 7.500.000 -- -- -- -- -- |
| 57. | UNKRIS Jakarta - University of Krisnadwipayana Jakarta | | 57.1. | Table Installment of UKT in UNKRIS | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.500.000 1.350.000 1.350.000 1.350.000 1.350.000 1.350.000 | 1.650.000 1.650.000 1.650.000 1.650.000 1.650.000 -- | 2.100.000 2.100.000 2.100.000 1.950.000 -- -- | 2.750.000 2.750.000 2.750.000 -- -- -- | 8.250.000 -- -- -- -- -- |
| 58. | UNLIP - Universitas Linggabuana PGRI Sukabumi | | 58.1. | UNLIP SPP Installment Table | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500.000 497.000 497.000 497.000 497.000 497.000 | 597.000 597.000 597.000 597.000 597.000 -- | 748.000 748.000 748.000 741.000 -- -- | 995.000 995.000 995.000 -- -- -- | 2.985.000 -- -- -- -- -- |
| 58.2. | UNLIP SPP Installment Table – Informatics, Agroindustrial Engineering, and Civil Engineering | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 535.000 535.000 535.000 535.000 535.000 535.000 | 642.000 642.000 642.000 642.000 642.000 -- | 805.000 805.000 805.000 795.000 -- -- | 1.070.000 1.070.000 1.070.000 -- -- -- | 3.210.000 -- -- -- -- -- |
| 58.3. | UNLIP SPP Installment Table – Informatics, Agroindustrial Engineering, and Civil Engineering | | For SMA/SMK, D3, etc. graduates continuing to Bachelor’s Program (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 535.000 535.000 535.000 535.000 535.000 535.000 | 642.000 642.000 642.000 642.000 642.000 -- | 805.000 805.000 805.000 795.000 -- -- | 1.070.000 1.070.000 1.070.000 -- -- -- | 3.210.000 -- -- -- -- -- |
| 59. | UNSURYA Jakarta - University of Dirgantara Marsekal Suryadarma | | 59.1. | Table Installment of SPP in University of Dirgantara Marsekal Suryadarma - Department of Management, Accounting, Law | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600.000 675.000 675.000 675.000 675.000 675.000 | 795.000 795.000 795.000 795.000 795.000 -- | 994.000 994.000 994.000 993.000 -- -- | 1.325.000 1.325.000 1.325.000 -- -- -- | 3.975.000 -- -- -- -- -- |
| 59.2. | Table Installment of SPP in University of Dirgantara Marsekal Suryadarma - Department of Industrial Engineering, Electrical Engineering | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 700.000 720.000 720.000 720.000 720.000 720.000 | 860.000 860.000 860.000 860.000 860.000 -- | 1.075.000 1.075.000 1.075.000 1.075.000 -- -- | 1.434.000 1.434.000 1.432.000 -- -- -- | 4.300.000 -- -- -- -- -- |
| 59.3. | Table Installment of SPP in University of Dirgantara Marsekal Suryadarma - Information Systems Department | | For graduate SMA/SMK, D3, etc. proceed to S1 Program |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600.000 610.000 610.000 610.000 610.000 610.000 | 730.000 730.000 730.000 730.000 730.000 -- | 913.000 913.000 913.000 911.000 -- -- | 1.217.000 1.217.000 1.216.000 -- -- -- | 3.650.000 -- -- -- -- -- |
| 59.4. | Table Installment of SPP in University of Dirgantara Marsekal Suryadarma - Magister of Management, Master of Laws | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 825.000 825.000 825.000 825.000 825.000 825.000 | 990.000 990.000 990.000 990.000 990.000 -- | 1.240.000 1.240.000 1.240.000 1.230.000 -- -- | 1.650.000 1.650.000 1.650.000 -- -- -- | 4.950.000 -- -- -- -- -- |
| 59.5. | Table of Tuition Fee Installment at Dirgantara University Marshal Suryadarma - Informatics Management | | For SKM graduates, equivalent proceed to D3 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 300 000 280 000 280 000 280 000 280 000 280 000 | 340 000 340 000 340 000 340 000 340 000 -- | 425 000 425 000 425 000 425 000 -- -- | 567.000 567.000 566.000 -- -- -- | 1 700 000 -- -- -- -- -- |
| 59.6. | Table of Tuition Fee Installments at Dirgantara Marshal Suryadarma University - Informatics Management | | For High School Graduates, Vocational High School, equivalent to Diploma (D3) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 500 000 500 000 500 000 500 000 500 000 500 000 | 600 000 600 000 600 000 600 000 600 000 -- | 750 000 750 000 750 000 750 000 -- -- | 1 000 000 1 000 000 1 000 000 -- -- -- | 3.000.000 -- -- -- -- -- |
| 59.7. | Table of Tuition Fee Installments at Dirgantara Marshal Suryadarma University - Informatics Management RPL Programs | | For High School Graduates, Vocational High School, equivalent to Diploma (D3) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 600 000 580.000 580.000 580.000 580.000 580.000 | 700.000 700.000 700.000 700.000 700.000 -- | 875.000 875.000 875.000 875.000 -- -- | 1.200.000 1.200.000 1 100 000 -- -- -- | 3.500.000 -- -- -- -- -- |
| 59.8. | Table of Tuition Fee Installments at Dirgantara Marshal Suryadarma University - Electro Engineering RPL Programs | | For High School Graduates, Vocational High School, D3 equivalent to (S1) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 850.000 830.000 830.000 830.000 830.000 830.000 | 1.000.000 1.000.000 1.000.000 1.000.000 1.000.000 -- | 1.250.000 1.250.000 1.250.000 1.250.000 -- -- | 1.700.000 1.700.000 1.600.000 -- -- -- | 5.000.000 -- -- -- -- -- |
| 59.9. | Table Installment of SPP in University of Dirgantara Marsekal Suryadarma - Magister of Management RPL Programs | | For graduate S1, equivalent proceed to S2 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.160.000 1.160.000 1.160.000 1.160.000 1.160.000 | 1.400.000 1.400.000 1.400.000 1.400.000 1.400.000 -- | 1.750.000 1.750.000 1.750.000 1.750.000 -- -- | 2.400.000 2.400.000 2.200.000 -- -- -- | 7.000.000 -- -- -- -- -- |
| 60. | Universitas Teknologi Nusantar - Nusantara Technology University | | 60.1. | Table of Tuition Fees at Nusantara University of Technology - Regular Class Program (Morning) | | For high school/vocational high school graduates, etc. proceed to S1 |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 400.000 400.000 400.000 400.000 400.000 400.000 | 480.000 480.000 480.000 480.000 480.000 -- | 600.000 600.000 600.000 600.000 -- -- | 800.000 800.000 800.000 -- -- -- | 2.400.000 -- -- -- -- -- |
| 60.2. | Table of Tuition Fees at Nusantara University of Technology - Employee Lecture Program (P2K) | | Table of Tuition Fee Installments at Nusantara Technology University - Evening, Weekend, and Blended Employee Class Program (P2K) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3x | 1 x | 1 2 3 4 5 6 | 400.000 400.000 400.000 400.000 400.000 400.000 | 480.000 480.000 480.000 480.000 480.000 -- | 600.000 600.000 600.000 600.000 -- -- | 800.000 800.000 800.000 -- -- -- | 2.400.000 -- -- -- -- -- |
| 61. | Universitas Wijaya Kusuma Sura - Wijaya Kusuma University Surabaya | | 61.1. | Table Installment of UKT in Wijaya Kusuma University Surabaya | | For S1 graduate proceed to MastersProgram (S-2) |
| Months | The number and amount of installments | | 6 x | 5 x | 4 x | 3 x | 1 x | 1 2 3 4 5 6 | 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 1.200.000 | 1.440.000 1.440.000 1.440.000 1.440.000 1.440.000 -- | 1.800.000 1.800.000 1.800.000 1.800.000 -- -- | 2.400.000 2.400.000 2.400.000 -- -- -- | 7.200.000 -- -- -- -- -- |
| | |
|
| FREE DOWNLOAD | Kelas Karyawan Brochure Combined All Areas of Indonesia ✊ pdf (11,2 MB)✊ Zip (8,8 MB) ✊ JPG (36,2 MB) | Kelas Karyawan Brochure JABODETABEK ✊ pdf (5,5 MB)✊ Zip (4,4 MB) ✊ JPG (13,2 MB) | Kelas Karyawan Brochure Java and Bali ✊ pdf (4,4 MB)✊ Zip (3,5 MB) ✊ JPG (14,5 MB) | Kelas Karyawan Brochure West Java ✊ pdf (2,8 MB)✊ Zip (2,2 MB) ✊ JPG (7,1 MB) | Kelas Karyawan Brochure SULAWESI ✊ pdf (1,9 MB)✊ Zip (1,5 MB) ✊ JPG (5,6 MB) | Kelas Karyawan Brochure SUMATERA & BATAM ✊ pdf (2,2 MB)✊ Zip (1,7 MB) ✊ JPG (6,5 MB) | Regular Program Brochure ✊ pdf (4,1 Mb)✊ Zip (8,4 Mb) | National Calendar 2023 ✊ JPG (2,1 Mb)✊ pdf (400 kb) | Collection of UN & PTN ✊ pdf(3,5 Mb)✊ Zip(1,5 Mb) | "New Breakthrough" Book Strategies to Increase Revenue PTS, Quality Education & Resources PTS ✊ pdf(6 Mb)✊ JPG(16 Mb) |
Brochure Request ( via POS) | Or send name and Your address via SMS to mobile: 0811 1990 9028
|
| Colleges Information PTS Distinguished & Notable S1, S2, D3 Administrator | |
Labelled Link | ⍄ ⍄
▰ Air Force NKRI
▰ NKRI, President, Vice President▰ MPR, DPR, DPD, MK, MA, BPK▰ BI, TNI, KPK, KPU, KPPU, KPAI, Komnas HAM▰ Department, Ministry▰ Agencies/Institutions : ANRI, BAKUN, BAPEDAL, BAPETEN, BATAN, BIN, BNN▰ Agencies/Institutions : BKKBN, BKN, BKPM, BMG, BakornasPBP, Bakosurtanal▰ Agencies/Institutions : BPKP, BPN, BPOM, BPPT, BPS, BSN, Bulog, LAN▰ Agencies/Institutions : LAPAN, LIPI, PMI, PNRI, KKPPI, LIN, TKPKRI ⍄
▰ Consul Cameroon
▰ KBRI & KJRI - Embassy & Consulate General Indonesia▰ Embassy & Consulate General Other Countries in - INDONESIA▰ Embassy & Consulate General Each State/Country -- ASEAN▰ Embassy & Consulate General -- Brunei, Philippines▰ Embassy & Consulate General -- Malaysia, Cambodia, Myanmar▰ Embassy & Consulate General -- Singapore, Thailand, Vietnam▰ Embassy & Consulate General Each State/Country -- OCEANIA▰ Embassy & Consulate General -- Australia, Fiji, Kiribati, Micronesia▰ Embassy & Consulate General -- Nauru, Papua New Guinea, Palau, the Marshall Islands▰ Embassy & Consulate General -- New Zealand, Solomon Islands, Tuvalu▰ Embassy & Consulate General Each State/Country -- ASIAN Continent▰ Embassy & Consulate General -- Afghanistan, Saudi Arabia, Armenia, Azerbaijan▰ Embassy & Consulate General -- Bahrain, Bangladesh, Georgia, Hong Kong, India▰ Embassy & Consulate General -- Iraq, Iran, Israel, Japan, Kazakhstan, Kuwait▰ Embassy & Consulate General -- Kyrgyzstan, South Korea, Lebanon, Maldives▰ Embassy & Consulate General -- Mongolia, Nepal, Pakistan, Palestine, Qatar▰ Embassy & Consulate General -- Cyprus, Sri Lanka, Syria, Taiwan, Tajikistan▰ Embassy & Consulate General -- East Timor, China / PRC, Turkmenistan▰ Embassy & Consulate General -- United Arab Emirates, Uzbekistan, Yemen, Jordan▰ Embassy & Consulate General Each State/Country -- EUROPEAN Continent▰ Embassy & Consulate General -- English, German, France, Russia, Switzerland▰ Embassy & Consulate General -- Netherlands, Belgium, Finland, Italy, Sweden▰ Embassy & Consulate General -- Andorra, Armenia, Austria, Azerbaijan▰ Embassy & Consulate General -- Belarus, Bosnia, Bulgaria, Denmark, Estonia▰ Embassy & Consulate General -- Georgia, Hungary, Ireland, Iceland▰ Embassy & Consulate General -- Faroe Islands, the European Commission, Croatia▰ Embassy & Consulate General -- Latvia, Liechtenstein, Lithuania, Luxembourg▰ Embassy & Consulate General -- Macedonia, Malta, Moldova, Monaco, Norway▰ Embassy & Consulate General -- Poland, Portugal, Czech Republic, Romania▰ Embassy & Consulate General -- Serbia, Cyprus, Slovakia, Slovenia▰ Embassy & Consulate General -- Spain, Turkey, Ukraine, Vatican, Greece▰ Embassy & Consulate General Each State/Country -- AMERICAN Continent▰ Embassy & Consulate General -- USA (United States) and Canada▰ Embassy & Consulate General -- Antigua & Barbuda, Argentina, Bahamas▰ Embassy & Consulate General -- Barbados, Belize, Bolivia, Brazil, Chile▰ Embassy & Consulate General -- Dominica, Ecuador, El Salvador, Grenada▰ Embassy & Consulate General -- Guatemala, Guyana, Haiti, Honduras, Jamaica▰ Embassy & Consulate General -- Colombia, Costa Rica, Cuba, Mexico ▰ Embassy & Consulate General -- Panama, Paraguay, Peru, Dominican Republic▰ Embassy & Consulate General -- Saint Kitts and Nevis, Saint Lucia▰ Embassy & Consulate General -- Saint Vincent & The Grenadines, Suriname▰ Embassy & Consulate General -- Trinidad & Tobago, Uruguay, Venezuela▰ Embassy & Consulate General -- South Africa, Algeria, Angola, Botswana▰ Embassy & Consulate General -- Burkina Faso, Cape Verde, Congo Democratic▰ Embassy & Consulate General -- Eritrea, Ethiopia, Gabon, Gambia, Ghana▰ Embassy & Consulate General -- Guinea, Cameroon, Kenya, Congo, Lesotho▰ Embassy & Consulate General -- Libya, Madagascar, Malawi, Mali, Morocco▰ Embassy & Consulate General -- Mauritania, Mauritius, Egypt, Mozambique▰ Embassy & Consulate General -- Namibia, Niger, Nigeria, Ivory Coast▰ Embassy & Consulate General -- Rwanda, Sao Tome & Principe, Senegal▰ Embassy & Consulate General -- Sierra Leone, Sudan, Swaziland, Tanzania▰ Embassy & Consulate General -- Tunisia, Uganda, Zambia, Zimbabwe ⍄ Consultation Psychology, etc. ⍄ ⍄
▰ Country Swaziland
▰ Link to Website Countries, Territories - AFRICA : Botswana, Burkina Faso, Burundi, Cape Verde, Chad▰ Link to Website Countries, Territories - AFRICA : Dem. Congo, Djibouti, Eritrea, Ethiopia, Gabon, Gambia▰ Link to Website Countries, Territories - AFRICA : Ghana, Guinea, Guinea Bissau, Equatorial Guinea, Cameroon▰ Link to Website Countries, Territories - AFRICA : Kenya, Comoros, Congo, Lesotho, Liberia, Libya, Madagascar▰ Link to Website Countries, Territories - AFRICA : Malawi, Mali, Morocco, Mauritania, Mauritius, Mayotte▰ Link to Website Countries, Territories - AFRICA : Egypt, Mozambique, Namibia, Niger, Nigeria, Ivory Coast▰ Link to Website Countries, Territories - AFRICA : Rwanda, Saint Helena, Sao Tome & Principe, Senegal▰ Link to Website Countries, Territories - AFRICA : Seychelles, Sierra Leone, Somalia, Somaliland, Sudan▰ Link to Website Countries, Territories - AFRICA : Swaziland, Tanzania, Togo, Tunisia, Uganda, Zambia, Zimbabwe▰ Link to Website Countries, Territories - NORTH AMERICA : Anguilla, Antigua & Barbuda, Aruba, United States▰ Link to Website Countries, Territories - NORTH AMERICA : Antilles, Aves, Bahamas, Barbados, Belize, Bermuda▰ Link to Website Countries, Territories - NORTH AMERICA : Cayman, Clipperton, Dominica, Dominican Rep, El Salvador▰ Link to Website Countries, Territories - NORTH AMERICA : Greenland, Grenada, Guadeloupe, Guatemala, Haiti▰ Link to Website Countries, Territories - NORTH AMERICA : Honduras, Jamaica, Canada, Costa Rica, Cuba▰ Link to Website Countries, Territories - NORTH AMERICA : Martinique, Mexico, Montserrat, Navassa, Nicaragua▰ Link to Website Countries, Territories - NORTH AMERICA : Panama, Puerto Rico, Vincent & Grenadines▰ Link to Website Countries, Territories - NORTH AMERICA : Trinidad & Tobago, Turks & Caicos Islands, Virgin Islands▰ Link to Website Countries, Territories - SOUTH AMERICA : Argentina, Bolivia, Brazil, Chile▰ Link to Website Countries, Territories - SOUTH AMERICA : Ecuador, Falkland Islands, Guyana▰ Link to Website Countries, Territories - SOUTH AMERICA : Guyana, Colombia, Paraguay▰ Link to Website Countries, Territories - SOUTH AMERICA : Peru, Surinam, Uruguay, Venezuela▰ Link to Website Countries, Territories - ASIA : South Africa, Central Africa, Algeria, Angola, Benin▰ Link to Website Countries, Territories - ASIA : Afghanistan, Saudi Arabia, Armenia, Azerbaijan, Bahrain▰ Link to Website Countries, Territories - ASIA : Bangladesh, Bhutan, Brunei Darussalam, China / Chinese▰ Link to Website Countries, Territories - ASIA : Philippines, Georgia, Hong Kong, India, Indonesia, Iraq▰ Link to Website Countries, Territories - ASIA : Iran, Israel, Japan, Cambodia, Kazakhstan, South Korea▰ Link to Website Countries, Territories - ASIA : North Korea, Kuwait, Kyrgyzstan, Laos, Lebanon, Macau▰ Link to Website Countries, Territories - ASIA : Maldives, Malaysia, Mongolia, Myanmar, Nagorno Karabakh▰ Link to Website Countries, Territories - ASIA : Nepal, Oman, Pakistan, Palestine, Qatar, Singapore▰ Link to Website Countries, Territories - ASIA : Sri Lanka, Syria, Taiwan, Tajikistan, Thailand▰ Link to Website Countries, Territories - ASIA : Timor-Leste, Turkey, Turkmenistan, United Arab Emirates▰ Link to Website Countries, Territories - ASIA : Uzbekistan, Vietnam, Yemen, Jordan▰ Link to Website Countries, Territories - EUROPE : Aland, Albania, Andorra, Austria, the Netherlands, Belarus▰ Link to Website Countries, Territories - EUROPE : Belgium, Bosnia, Bulgaria, Czech Republic, Denmark, Estonia▰ Link to Website Countries, Territories - EUROPE : European Union, Faroes, Finland, Gibraltar, Guernsey▰ Link to Website Countries, Territories - EUROPE : Hungary, the UK, Ireland, Iceland, Italy, Germany▰ Link to Website Countries, Territories - EUROPE : Jersey, Kosovo, Croatia, Latvia, Liechtenstein▰ Link to Website Countries, Territories - EUROPE : Lithuania, Luxembourg, Macedonia, Malta, Man Islands▰ Link to Website Countries, Territories - EUROPE : Moldova, Monaco, Norway, France, Poland ▰ Link to Website Countries, Territories - EUROPE : Portugal, Romania, Russia, San Marino, Serbia, Cyprus▰ Link to Website Countries, Territories - EUROPE : Slovakia, Slovenia, Spain, Sweden, Switzerland▰ Link to Website Countries, Territories - EUROPE : Transnistria, Ukraine, the Vatican, Greece▰ Link to Website Countries, Territories - OCEANIA : Australia, Fiji, Guam, New Caledonia, Kiribati▰ Link to Website Countries, Territories - OCEANIA : Micronesia, Nauru, Niue, Palau, Papua New Guinea▰ Link to Website Countries, Territories - OCEANIA : Polynesia, Cook Islands, the Marshall Islands, Pitcairn Island▰ Link to Website Countries, Territories - OCEANIA : Northern Mariana Islands, the Solomon Islands, Samoa▰ Link to Website Countries, Territories - OCEANIA : New Zealand, Tonga, Tuvalu, Vanuatu, Wallis & Futuna▰ Link to Website Countries, Territories in - The whole world ⍄ ⍄ ⍄ ⍄ ⍄ ⍄ ⍄ ⍄
▰ Hospital in Sulsel
▰ Hospital (RSU, RSK, RSJ, etc) -- in Jakarta▰ Hospital (RSU, RSK, RSJ, etc) -- in Banten, West Java▰ Hospital (RSU, RSK, RSJ, etc) -- in Central Java, Yogyakarta▰ Hospital (RSU, RSK, RSJ, etc) -- in East Java▰ Hospital (RSU, RSK, RSJ, etc) -- in Bali, NTT, NTB, Maluku, Papua▰ Hospital (RSU, RSK, RSJ, etc) -- in North Sumatra, Aceh (NAD), Riau▰ Hospital (RSU, RSK, RSJ, etc) -- in West Sumatra, Jambi, Bengkulu▰ Hospital (RSU, RSK, RSJ, etc) -- in South Sumatra, Lampung, Bangka Belitung▰ Hospital (RSU, RSK, RSJ, etc) -- in Kalimantan ⍄ Internet Referral Lecture⍄ ⍄ ⍄ ⍄
▰ Link to UKLA (UK)
▰ National Library of Countries in the World▰ Libraries in Regional Organization / internasonal▰ Reference Services / Other Libraries▰ National Library in South Africa, United States, Argentina, Australia, Netherlands▰ National Library in Belgium, Botswana, Brazil, Chile, Denmark, Estonia, Russia ▰ National Library in Finland, Guatemala, Honduras, Hungary, Indonesia, England▰ National Library in Ireland, Iceland, Italy, Jamaica, Japan, Germany, Canada▰ National Library in Kazakhstan, Kenya, the Faroe Islands, Cuba, Lithuania, Malaysia▰ National Library in Mexico, Egypt, Namibia, Nepal, Nigeria, Norway, Panama, Peru▰ National Library in Poland, Portugal, France, the Czech Republic, Republic of Korea▰ National Library in New Zealand, Serbia, Singapore, Scotland, Slovenia, Spain▰ National Library in Sweden, Switzerland, Taiwan, Thailand, China (PRC)▰ National Library in Trinidad & Tobago, Turkey, Venezuela, Wales, Zambia, Zimbabwe▰ Library in Organizations : ACP, ADB, APEC, CAC, CDCA, CDIAL, CGIAR, DEPOLIB, ECCL▰ Library in Organizations : ECLAC / CDCC, ELDIS, EUR-Lex, EUR-OP, FAO, FAOSTAT, FITA▰ Library in Organizations : IADB-FHL, IDRC, ILO, IMF, ITC-ILO, ITU, OAS, OECD, SPC▰ Library in Organizations : DHL UN, UN ECA, UN ECE, UN ECLAC, UN ESCAP, UN ESCWA▰ Library in Organizations : UN SFL, UNCAPS, UNCTAD, UNHCR, UNIDO, UNOG, UNUL, WAICENT▰ Library in Organizations : WIPO, World Bank, WTO▰ International Library Association : FID, IFIP, OCLC, RLG, SLA, Aslib, ALPSP, IFLANET▰ National Library Association in AFRICA : LIASA (South Africa), ULA (Uganda), ZLA (Zambia)▰ National Library Association in AMERICA : FBABCII (Brazil), CLA (Canadian), CBC (Chile)▰ National Library Association in AMERICA : LIA (Jamaica), AMBAC (Mexico), ALA (USA)▰ National Library Association in AMERICA : ARL (USA), DLF (USA), LATT (Trinidad and Tobago)▰ National Library Association in OCEANIA : ALIA (Australia), LIANZA (New Zealand)▰ National Library Association in ASIA : JLA (Japan), JSLA (Japan), plague (Pakistan)▰ National Library Association in ASIA : PLAI (Philippines), SLA (Singapore)▰ National Library Association in EUROPE : ABD (Belgium), ULISO (Bulgaria), ALIPCR (Czech Republic)▰ National Library Association in EUROPE : FLA (Finland), ABF (France), ADBS (France)▰ National Library Association in EUROPE : LAI (Ireland), ANABAD (Spain), SEDIC (Spain)▰ National Library Association in EUROPE : SAIS (Sweden), ABBS (Switzerland), UKLA (UK)▰ Regional Library Association : ABINIA, ACURIL, CONSAL, EBLIDA, CUP ⍄ ⍄ Online Tutorials/Manuals⍄
▰ PTS in KOPERTIS V
▰ Private Colleges (PTS) -- in Jakarta --- Kopertis III▰ Private Colleges (PTS) -- in Banten & West Java --- Kopertis IV▰ Private Colleges (PTS) -- in Central Java --- Kopertis VI▰ Private Colleges (PTS) -- in East Java --- Kopertis VII▰ Private Colleges (PTS) -- in Bali, NTB, NTT --- Kopertis VIII▰ Private Colleges (PTS) -- in North Sumatra & NAD/Aceh --- Kopertis I▰ Private Colleges (PTS) -- in West Sumatra, Riau, Riau, Jambi --- Kopertis X▰ Private Colleges (PTS) -- in South Sumatera, Bengkulu, Lampung, Bangka Belitung --- Kopertis II▰ Private Colleges (PTS) -- in Sulawesi --- Kopertis IX▰ Private Colleges (PTS) -- in Kalimantan --- Kopertis XI▰ Private Colleges (PTS) -- in Maluku, North Maluku, Papua, West Papua --- Kopertis XII▰ PTAIS -- Special PTS Islamic Religious - Under DEPAG ⍄ ⍄
▰ Political parties in - INDONESIA▰ Political parties in - United States, Australia, Austria, Netherlands▰ Political parties in - Belgium, Brazil, Denmark, Finland, India, Italy▰ Political parties in - Britain, Germany, Canada, Croatia, Norway▰ Political parties in - France, Spain, Sweden, Switzerland, Turkey▰ Political parties in Each Country -- AFRICA▰ Political parties in Each Country -- other AMERICA▰ Political parties in Each Country -- other ASIA and OCEANIA▰ Political parties in Each Country -- other EUROPE▰ Political parties in AFRICA: South Africa, Algeria, Angola, Benin, Burkina Faso▰ Political parties in AFRICA: Cameroon, Cape Verde, Central Africa, Chad, Comoros, Congo▰ Political parties in AFRICA: Ivory Coast, Djibouti, Egypt, Ethiopia, Gambia, Ghana▰ Political parties in AFRICA: Kenya, Libya, Mali, Mauritania, Mauritius, Morocco, Mozambique▰ Political parties in AFRICA: Namibia, Nigeria, Rwanda, Senegal, Seychelles, Sierra Leone▰ Political parties in AFRICA: Somaliland, Sudan, Tanzania, Togo, Tunisia, Zimbabwe▰ Political parties in AMERICA: Anguilla, Antilles, Argentina, Aruba, Barbados, Belize▰ Political parties in AMERICA: Bermuda, Bolivia, Chile, Dominican Republic, Ecuador, El Salvador▰ Political parties in AMERICA: Guyana, Haiti, Honduras, Jamaica, Colombia, Costa Rica, Cuba▰ Political parties in AMERICA: Mexico, Nicaragua, Panama, Peru, Puerto Rico, Saint Kitts▰ Political parties in AMERICA: Suriname, Trinidad & Tobago, Uruguay, Venezuela▰ Political parties in ASIA: Afghanistan, Bangladesh, China (PRC)▰ Political parties in ASIA: Philippines, Iraq, Iran, Israel, Japan, Cambodia▰ Political parties in ASIA: South Korea, Lebanon, Malaysia, Mongolia, Nepal▰ Political parties in ASIA: Pakistan, Palestine, Singapore, Sri Lanka, Taiwan▰ Political parties in ASIA: Thailand, Timor Leste, Uzbekistan, Vietnam, Yamang▰ Political parties in OCEANIA: New Zealand, Fiji, New Caledonia▰ Political parties in EUROPE: Aland, Andorra, Armenia, Belarus, Bosnia, Bulgaria▰ Political parties in EUROPE: Czech Republic, Estonia, Faroes, Greenland, Hungary▰ Political parties in EUROPE: Ireland, Iceland, Latvia, Liechtenstein, Lithuania▰ Political parties in EUROPE: Luxembourg, Macedonia, Malta, Poland, Portugal▰ Political parties in EUROPE: Romania, Russia, San Marino, Serbia, Cyprus, Slovakia▰ Political parties in EUROPE: Slovenia, Ukraine, the European Union, Greece ⍄ ⍄
▰ Portal SADC - SACCAR
▰ UN and Institutions in UN▰ World Institutions outside the UN coordination▰ Multi-Government Institutions in -- ASIA▰ Multi-Government Institutions in -- AMERICA▰ Multi-Government Institutions in -- EUROPE▰ Multi-Government Institutions in -- EUROPE▰ Multi-Government Institutions in -- OCEANIA▰ Institutions in UN : ECA, ECE, ECLAC, ESCAP, ESCWA, FAO, FAO GFCM, FAO WAICENT▰ Institutions in UN : IAEA, IBRD, IBRD ICSID, IBRD IDA, ICAO, ICC, ICC cpi, ICJ▰ Institutions in UN : ICSC, ICTR, ICTY, IFAD, IFC, ILO, IMF, IMO (IMCO) ▰ Institutions in UN : INSTRAWm IPCC, ITC, ITU, NGLS, OHCHR, PRHP, RCNet, RDFS▰ Institutions in UN : Relief Web, UN-ACC (CEB), UN-CEB, UN-CSB, UN-DC, UN-HA▰ Institutions in UN : UN-HLCM, UN-HLCP, UN-Human Rights, UN-IACSD, UN-IANWGE▰ Institutions in UN : UN-International Law, UN-JIAMCATT, UN-JIU, UN-JUNIC▰ Institutions in UN : UN-News Centre, UN-OCHA, UN-PIN, UN-Press Releases, UN-SCN▰ Institutions in UN : UN-UNCAPS, UNAIDS, UNAO, UNBA, UNCC, UNCCD, UNCDF, UNCITRAL▰ Institutions in UN : UNCJIN, UNCSD, UNCTAD, UNCTAD GPGLSHD, UNDCP, UNDG, UNDP▰ Institutions in UN : UNDP HDRS, UNDP PMUN, UNDP UNIFEM, UNEP, UNESCO, UNESCO IBE▰ Institutions in UN : UNESCO IIEP, UNESCO IS, UNFCCC, UNFIP, UNFPA, UNGIWG▰ Institutions in UN : UN-HABITAT, UNHCR, UNHCR Statistics, UNICEF, UNICEF ICDC▰ Institutions in UN : UNICEF Statistics, UNICRI, UNICT TF, UNIDIR, UNIDO, UNIS▰ Institutions in UN : UNITAR, UNJSPF, UNMAS, UNODC, UNOG, UNON, UNOPS, UNOV, UNOV▰ Institutions in UN : UNPA, UNRISD, UNRWA, UNSCEAR, UNSO, UNSSC, UNU, UNV, UNWTO▰ Institutions in UN : UPU, WFP, WHO, WIPO, WMO, Women Watch, WTO▰ World Institutions : ABEDA, ACP, ACS, ADB, AfDB, ALADI, AMAP, AMF, AMU, APCC, APEC, APO▰ World Institutions : Arctic Council, Arctic Council, ASEAN, ATS, AU/OAU, BCEAO, BCIE▰ World Institutions : BIPM, BIS, BMEPC Helsinki Com., BSEC, BTWC, CAB International, CAN▰ World Institutions : CARICOM, CBD, CBS, CBSS, CCAMLR, CDB, CEDA, CEI, CEN-SAD, CERN▰ World Institutions : CGAP, CGIAR, CIRDAP, CIS, CIS, CLC, CoE, COI, COMESA, CP, CPLP▰ World Institutions : CPPS, CTBTO, DECUS, EAC, EAPC, EBRD, ECB, ECCAS, ECHR, ECO, ECOWAS▰ World Institutions : EFTA, EIB, ESA, EU, EURASEC, European Parliament, European Patent▰ World Institutions : EUTELSAT, FATFML, FFA, FTAA, G20, G-77, G8, GCC, GCTU, GEFS, IABD▰ World Institutions : IAPSO, IATTC, IAWG, IBSFC, ICCAT, ICES, ICFTU, ICGEB, ICO, ICS▰ World Institutions : ICSG, ICTP, ICWBO, IDB, IEA, IGAD, IGC, IHO, IMSO, INIA, INTERPOL▰ World Institutions : IOC, IOM, IOTC, IPHC, IPU, IRSG, ISA, ISDR, ISO, ITC/ILO, ITSO▰ World Institutions : ITUC, IUCN, IWC, LAS, MERCOSUR, MIGA, MTCR, NACEC, NAD Bank, NAFO▰ World Institutions : NAFTA, NAM, NASCO, NATO, NCCM, NEA, NEAFC, NPAFC, NPT, NSG, OAPEC▰ World Institutions : OAS, OECD, OECS, OIC, OIF, OOSA, OPCW, OPEC, OPNAL, OSCE, OSPAR▰ World Institutions : PAHO, Paris Club, Parlamento Amazonico, PC, PCA, PICES, PIF, PSC▰ World Institutions : SAARC, SADC, SAMEO, Schengen Visa, SC-IODC, SCO, SECI, SECIB▰ World Institutions : SICA, SOPAC, SPC, The Commonwealth, The Northern Forum, UNIDROIT▰ World Institutions : Unilat, UNPO, WADB, WAEMU, WCC, WCL, WCO / CCC, WEU, WFTU, WVW▰ Multi-Country Organization in ASIA : APO, ASEAN, ASEAN Centre di Jepang, ASEAN-IPO▰ Multi-Country Organization in ASIA : Asian Development Bank, Asian Patent Office, ASOSAI, CEW▰ Multi-Country Organization in ASIA : CIRDAP, COCI, COCI Brunei, COCI Cambodia, COCI Indonesia▰ Multi-Country Organization in ASIA : COCI Laos, COCI Malaysia, COCI Myanmar, COCI Philippines▰ Multi-Country Organization in ASIA : COCI Singapore, COCI Thailand, COCI Vietnam, GCC, GOIC▰ Multi-Country Organization in ASIA : MRC, SAARC, SEAFDEC, SEAMEO▰ Multi-Country Organization in AFRICA : African Development Bank, African Union (AU), ASECNA▰ Multi-Country Organization in AFRICA : COMESA, EAC, EDEAO-ECOWAS, IMAO-WAMI, IOC, PTA Bank, SADC▰ Multi-Country Organization in AFRICA : SADC-CCBG, SADC-ECF, SADC-ESTAU, SADC-FANRDU, SADC-FSTCU▰ Multi-Country Organization in AFRICA : SADC-HRDSCU, SADC-MSCU, SADC-SACCAR, SADC-WSCU, SEACAM▰ Multi-Country Organization in AFRICA : UEMOA, UEMOA-BCEAO, UEMOA-BOAD, UMA, WARDA ▰ Multi-Country Organization in AMERICA : ACS, ALADI, Andean Community, Andes Parliament, CAF▰ Multi-Country Organization in AMERICA : CARICOM, CARICOM-CDB, CARICOM-CDERA, CARICOM-CEHI▰ Multi-Country Organization in AMERICA : CARICOM-CMI, CATIE-TARHEC, CCAD, CCJ, CCLEC, CEDA ▰ Multi-Country Organization in AMERICA : CFRAMP (CARICOM-FRAMP), CIH, CLAD, COMTELCA, CPPS, CXC▰ Multi-Country Organization in AMERICA : NAFTA, NAFTA-BECC, NAFTA-CEC, NAFTA-NAAEC, NAFTA-NAALC▰ Multi-Country Organization in AMERICA : NAFTA-NADBank, NAFTA-NAPPO, OAS, OECS, OECS-DCA▰ Multi-Country Organization in AMERICA : OECS-ECCB, OECS-ECIPS, OECS-EECSM, OECS-ESDU▰ Multi-Country Organization in AMERICA : OECS-HCOECS, OERU (OECS-ERU), OLACEFS, OLADE, PAHO/OPS▰ Multi-Country Organization in AMERICA : PAHO/OPS-Argentina, PAHO/OPS-Bolivia, PAHO/OPS-Brasil▰ Multi-Country Organization in AMERICA : PAHO/OPS-Colombia, PAHO/OPS-Costa Rica, PAHO/OPS-CPC▰ Multi-Country Organization in AMERICA : PAHO/OPS-Cuba, PAHO/OPS-El Salvador, PAHO/OPS-Guatemala▰ Multi-Country Organization in AMERICA : PAHO/OPS-Nicaragua, PAHO/OPS-Panama, PAHO/OPS-Peru▰ Multi-Country Organization in AMERICA : PAIGH, PARLATINO, SELA, SICA, SICA-PARLACEN, SICA-SIECA▰ Multi-Country Organization in AMERICA : SIECA-BCIE, SIECA-CMCA, SIECA-ICAITI, TJCA▰ Multi-Country Organization in EUROPE : AA, AER, BCM, BCM-Baltic Assembly, BEU, BEU-BTO, BSSSC▰ Multi-Country Organization in EUROPE : CBSS, CEFTA, CEI, CEPT, CEPT-CERP, CEPT-ERO, CEPT-ETO ▰ Multi-Country Organization in EUROPE : CERN, CIPRA, CoE-CHR, CoE-CLRAE, CoE-CoM, CoE-CPT▰ Multi-Country Organization in EUROPE : CoE-Development Bank, CoE-DQM, CoE-DYS, CoE-EAO ▰ Multi-Country Organization in EUROPE : CoE-ECHR, CoE-ECRI, CoE-PA, CoE-Secretary General, COST▰ Multi-Country Organization in EUROPE : COTRAO, Council of Europe (CoE), EBRD, EBU, ECMT, ECMWF▰ Multi-Country Organization in EUROPE : EFDA, EFTA, EFTA Court, EFTA Secretariat, EFTA-SA, EIARD▰ Multi-Country Organization in EUROPE : EMBL, EPO, ESA, ESA-ECSL, ESA-ESOC, ESA-ESTEC▰ Multi-Country Organization in EUROPE : ESA-Publications, ESA-VSTS, ESO, EUROCntrol▰ Multi-Country Organization in EUROPE : European Union (EU), EUROSAI, NAMMCO, NC/NCoM▰ Multi-Country Organization in EUROPE : NC/NCoM-Estonia, NC/NCoM-Latvia, NC/NCoM-Lithuania▰ Multi-Country Organization in EUROPE : NCoM-Russian, OSCE, WCAA, WEU, WEU-WEAG, WEU-WEAO, WNC▰ Multi-Country Organization in OCEANIA : ACAG, ANZLIC, APIL, Pacific Community, PC-PWB▰ Multi-Country Organization in OCEANIA : PC-PYB, PIDP, PIF, PIF-FFA, PIF-PITICA, PIF-PITICS▰ Multi-Country Organization in OCEANIA : SOPAC, SPREP, SPTO ⍄ ⍄ Reader⍄
▰ Rent Domain Surabaya
▰ Rent Domain - INDONESIA (Jakarta, Bogor, Depok, Tangerang, Bekasi)▰ Rent Domain - INDONESIA (Medan, Pekanbaru, Deliserdang, Batam)▰ Rent Domain - INDONESIA (Denpasar, Gianyar, Mataram)▰ FREE Domain Hosting - The whole world▰ Rent Domain - USA (United States)▰ Rent Domain - ASEAN countries (Singapore, Malaysia, Philippines, Thailand)▰ Rent Domain - Australia, New Zealand▰ Rent Domain - China (PRC), Hong Kong, Taiwan▰ Rent Domain - Israel, Turkey, Egypt, Bahrain▰ Rent Domain - Netherlands, Germany, Switzerland, Austria▰ Rent Domain - Italy, France, Russia, Denmark▰ Rent Domain - Spain, Portugal, Ireland, Brazil▰ Rent Domain - Poland, Norway, Barbados, Bahamas▰ Rent Domain - Slovakia, Serbia, Montreal, Tanzania▰ Rent Domain - English (UK), Canada▰ Rent Domain - Japan, India, Sri Lanka, Nepal▰ Rent Domain - Saudi Arabia, Iran, Dubai, Middle East▰ Rent Domain - South Africa, Azerbaidan, Algeria▰ Rent Domain - Lithuania, Czech Republic, Belgium, Monaco▰ Rent Domain - Romania, Finland, Cyprus, Ecuador, Morocco ⍄ ⍄ ⍄ ⍄ ⍄ ⍄ ⍄ ⍄ ⍄ ⍄
|
 | New Solution |  |
| Strategies Increase PTS revenue, PTS Education Quality, and PTS Resources | | Full information, click | | http://kpt.co.id |
Job Info
PT. Gilland Ganesha
- Design Grafis
- Senior Programmer
|
|
|
|